CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

07:0303/15 CST▶ 直播
任务档案 · MISSION

Crew-10

SpaceX · 猎鹰 9 Block 5 · 39A 号发射工位 (LC-39A)

成功
任务成功
▶ 观看直播

任务简介

SpaceX Crew-10 是作为 NASA 商业载人计划的一部分,前往国际空间站的第十次载人龙飞船载人运营飞行。

原文
SpaceX

SpaceX Crew-10 is the tenth crewed operational flight of a Crew Dragon spacecraft to the International Space Station as part of NASA's Commercial Crew Program.

飞行时间线 Flight Timeline26 节点

T−45:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−42:00
机组登舱臂收回Crew Access Arm Retract
Retraction of the crew access arm from the rocket
T−39:00
发射逃逸系统 (LES) 武装Dragon
Dragon's launch escape system is armed
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−05:00
切换内部电源Dragon
Dragon transitions to internal power
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+00:58
最大动压点Max-Q
Maximum dynamic pressure
T+02:26
主发动机关机MECO
Cut-off of the main engine
T+02:29
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:37
二级发动机第一次启动SES-1
First start of the second engine
T+02:43
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+03:30
助推器返回关机Booster Boostback Burn Shutdown
End of the booster boostback burn
T+06:18
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:29
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:22
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+07:39
一级着陆Stage 1 Landing
Landing of the first stage
T+08:58
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+09:58
飞船与二级分离Dragon
Dragon separates from the second stage
T+10:46
头锥开启Dragon
Start of the opening sequence of Dragon's nosecone

任务更新17

07:1903/15
Cosmic_Penguin · 03/14

Launch success.

↗ 链接
07:0403/15
Cosmic_Penguin · 03/14

Liftoff.

↗ 链接
02:5803/15
LL2 · 03/14

Official Webcast by NASA has started

↗ 链接
00:0603/15
Cosmic_Penguin · 03/14

Tweaked T-0.

↗ 链接
01:3803/14
Cosmic_Penguin · 03/13

Tweaked T-0. (Weather forecast per https://afspc.github.io/45th-Weather-Squadron/assets/LaunchForecasts/Falcon%209%20Crew%2010%20L-1%20Forecast%20-%2014%20Mar%20Launch.pdf)

↗ 链接
10:3503/13
Cosmic_Penguin · 03/13

NET March 14.

↗ 链接
07:0703/13
Cosmic_Penguin · 03/12

Scrubbed for the day due to TEL arm hydraulics issue.

↗ 链接
03:4303/13
LL2 · 03/12

Official Webcast by NASA has started

↗ 链接
01:0803/11
Nosu · 03/10

Weather is >95% favorable for launch.

↗ 链接
02:3603/06
Cosmic_Penguin · 03/05

GO for launch.

↗ 链接
07:3702/27
Cosmic_Penguin · 02/26

Tweaked T-0.

↗ 链接
11:4002/12
Cosmic_Penguin · 02/12

Moved up to March 12 and crew vehicle switched (launch time is per https://www.launchphotography.com/Launch_Viewing_Guide.html).

↗ 链接
04:4702/08
Nosu · 02/07

Adding pad

↗ 链接
13:3712/18
Cosmic_Penguin · 12/18

NET March 25.

↗ 链接
06:4412/18
Nosu · 12/17

NET late March 2025

↗ 链接
00:1407/27
hitura-nobad · 07/26

Moved forward to Feb 2025

↗ 链接
21:2604/02
Cosmic_Penguin · 04/02

NET 2nd half of 2025.

↗ 链接