CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

10:2911/05 CST▶ 直播
任务档案 · MISSION

Dragon CRS-2 SpX-31

SpaceX · 猎鹰 9 Block 5 · 39A 号发射工位 (LC-39A)

成功
任务成功
▶ 观看直播

任务简介

SpaceX执行的第31次国际空间站商业补给服务任务。此次飞行将根据与NASA签订的第二次商业补给服务合同进行。 货运龙飞船2号将运送补给和有效载荷,包括直接支持轨道实验室上进行的科学和研究调查的关键材料。

原文
SpaceX

31st commercial resupply services mission to the International Space Station operated by SpaceX. The flight will be conducted under the second Commercial Resupply Services contract with NASA. Cargo Dragon 2 brings supplies and payloads, including critical materials to directly support science and research investigations that occur onboard the orbiting laboratory.

飞行时间线 Flight Timeline24 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−05:00
切换内部电源Dragon
Dragon transitions to internal power
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:08
最大动压点Max-Q
Maximum dynamic pressure
T+02:19
主发动机关机MECO
Cut-off of the main engine
T+02:22
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:30
二级发动机第一次启动SES-1
First start of the second engine
T+02:36
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+03:28
助推器返回关机Booster Boostback Burn Shutdown
End of the booster boostback burn
T+06:25
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:38
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:26
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+07:49
一级着陆Stage 1 Landing
Landing of the first stage
T+08:35
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+09:25
飞船与二级分离Dragon
Dragon separates from the second stage
T+10:08
头锥开启Dragon
Start of the opening sequence of Dragon's nosecone

任务更新16

10:4811/05
Cosmic_Penguin · 11/05

Launch success with Dragon nose cone deployed.

↗ 链接
10:3011/05
Cosmic_Penguin · 11/05

Liftoff.

↗ 链接
09:3611/05
Cosmic_Penguin · 11/05

Tweaked T-0.

↗ 链接
06:0011/04
hitura-nobad · 11/03

Weather is 70% GO for launch.

↗ 链接
03:0411/03
Cosmic_Penguin · 11/02

Tweaked T-0.

↗ 链接
11:0510/31
Cosmic_Penguin · 10/31

GO for launch.

↗ 链接
07:5410/25
Cosmic_Penguin · 10/24

NET November 5 UTC.

↗ 链接
01:5410/18
Cosmic_Penguin · 10/17

Delayed to November 2 UTC.

↗ 链接
10:0910/16
Cosmic_Penguin · 10/16

Tweaked T-0.

↗ 链接
02:4310/04
Cosmic_Penguin · 10/03

Changed launch pad.

↗ 链接
11:0510/02
Cosmic_Penguin · 10/02

NET October 30.

↗ 链接
14:1509/19
Cosmic_Penguin · 09/19

NET Late October.

↗ 链接
08:0909/13
Cosmic_Penguin · 09/13

Added approximate launch time.

↗ 链接
08:0608/07
Cosmic_Penguin · 08/07

Delayed to NET mid-October to await available docking ports after delays in Starliner CFT and Dragon Crew-9.

↗ 链接
08:1503/24
Cosmic_Penguin · 03/24

NET September 2024. (page SO-27)

↗ 链接
15:1109/20
Nosu · 09/20

Targeting June 2024

↗ 链接