CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

09:4509/13 CST▶ 直播
任务档案 · MISSION

星链 9-6

SpaceX · 猎鹰 9 Block 5 · 4E 号发射工位 (SLC-4E)

成功
任务成功
▶ 观看直播

任务简介

一批21颗卫星用于星链巨型星座——SpaceX的太空互联网通信系统项目。

原文
SpaceX

A batch of 21 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.

飞行时间线 Flight Timeline23 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:07
最大动压点Max-Q
Maximum dynamic pressure
T+02:26
主发动机关机MECO
Cut-off of the main engine
T+02:30
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:36
二级发动机第一次启动SES-1
First start of the second engine
T+03:02
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:06
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:28
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:50
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:12
一级着陆Stage 1 Landing
Landing of the first stage
T+08:40
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+53:55
二级发动机第二次启动SES-2
Second start of the second engine
T+53:56
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+01:00:48
卫星组释放Starlink
Deployment of the Starlink stack from the rocket

任务更新9

10:5809/13
Cosmic_Penguin · 09/13

Launch success.

↗ 链接
09:4509/13
Cosmic_Penguin · 09/13

Liftoff.

↗ 链接
09:3509/13
LL2 · 09/13

Unofficial Re-stream by SPACE AFFAIRS has started

↗ 链接
04:1409/13
Nosu · 09/12

Launch window is accurate to the second

↗ 链接
04:1309/13
Nosu · 09/12

Setting GO

↗ 链接
08:1109/12
Cosmic_Penguin · 09/12

Delayed to NET September 13 UTC per NOTAMs.

↗ 链接
15:4709/11
Cosmic_Penguin · 09/11

Tweaked T-0.

↗ 链接
21:5809/08
Cosmic_Penguin · 09/08

Tweaked launch window.

↗ 链接
00:2709/07
Cosmic_Penguin · 09/06

Targeting NET September 12 UTC per NOTAMs A1585/24 & R0237/24.

↗ 链接