CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

06:0505/16 CST▶ 直播
任务档案 · MISSION

Dragon CRS-2 SpX-34

SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
任务成功
▶ 观看直播

任务简介

SpaceX执行的第34次国际空间站商业补给服务任务。该飞行将根据与NASA签订的第二份商业补给服务合同进行。 货运龙飞船2号携带补给和有效载荷,包括直接支持轨道实验室上进行的科学和研究调查的关键材料。

原文
SpaceX

34th commercial resupply services mission to the International Space Station operated by SpaceX. The flight will be conducted under the second Commercial Resupply Services contract with NASA. Cargo Dragon 2 brings supplies and payloads, including critical materials to directly support science and research investigations that occur onboard the orbiting laboratory.

飞行时间线 Flight Timeline24 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−05:00
切换内部电源Dragon
Dragon transitions to internal power
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:08
最大动压点Max-Q
Maximum dynamic pressure
T+02:17
主发动机关机MECO
Cut-off of the main engine
T+02:18
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:22
一级翻转机动Stage 1 Flip
Flip maneuver of the first stage
T+02:26
二级发动机第一次启动SES-1
First start of the second engine
T+02:31
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+06:19
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:31
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:32
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+07:42
一级着陆Stage 1 Landing
Landing of the first stage
T+08:30
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+09:22
飞船与二级分离Dragon
Dragon separates from the second stage
T+10:33
头锥开启Dragon
Start of the opening sequence of Dragon's nosecone

任务更新21

06:2505/16
Cosmic_Penguin · 05/15

Launch success.

↗ 链接
06:0605/16
Cosmic_Penguin · 05/15

Liftoff.

↗ 链接
05:4405/16
LL2 · 05/15

Official Webcast by NASA has started

↗ 链接
05:0805/16
Cosmic_Penguin · 05/15

Updated launch weather.

↗ 链接
21:1305/15
Cosmic_Penguin · 05/15

Tweaked T-0.

↗ 链接
10:1805/15
Cosmic_Penguin · 05/15

Tweaked T-0.

↗ 链接
06:5505/14
Cosmic_Penguin · 05/13

Scrub due to launch site weather.

↗ 链接
06:5105/14
Cosmic_Penguin · 05/13

Hold for weather.

↗ 链接
06:3605/14
Cosmic_Penguin · 05/13

Updated weather forecast.

↗ 链接
06:0405/14
Cosmic_Penguin · 05/13

Updated weather forecast.

↗ 链接
07:1305/13
Cosmic_Penguin · 05/12

Tweaked T-0.

↗ 链接
06:1105/13
Cosmic_Penguin · 05/12

Updated launch weather, 60% GO.

↗ 链接
04:3405/13
Cosmic_Penguin · 05/12

Confirmed rescheduled to May 13.

↗ 链接
04:2105/13
Cosmic_Penguin · 05/12

Scrubbed for the day.

↗ 链接
07:4805/12
Cosmic_Penguin · 05/11

Tweaked T-0.

↗ 链接
23:5805/11
Cosmic_Penguin · 05/11

Updated launch weather, 35% GO.

↗ 链接
02:5805/09
Cosmic_Penguin · 05/08

Tweaked T-0.

↗ 链接
00:2505/01
Cosmic_Penguin · 04/30

Tweaked T-0.

↗ 链接
08:3204/29
Cosmic_Penguin · 04/29

Launch pad assigned.

↗ 链接
02:4104/21
Cosmic_Penguin · 04/20

NET May 12.

↗ 链接
02:3912/11
Cosmic_Penguin · 12/10

NET May 2026.

↗ 链接