CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

14:3906/17 CST▶ 直播
任务档案 · MISSION

BlueBird Block 2 #3-5

SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
任务成功
▶ 观看直播

任务简介

AST SpaceMobile 的 Block 2 BlueBird 卫星设计提供高达 BlueBird Block 1 卫星 10 倍的带宽容量,以实现美国境内全天候连续蜂窝宽带服务覆盖,其波束设计支持高达 40 MHz 的容量,可实现高达 120 Mbps 的峰值数据传输速度,支持语音、完整数据和视频应用。Block 2 BlueBird 卫星拥有高达 2400 平方英尺的通信阵列,一旦发射,将成为低地球轨道上商业部署的最大卫星。 此次发射将搭载 4 颗卫星。

原文
SpaceX

AST SpaceMobile’s Block 2 BlueBird satellites are designed to deliver up to 10 times the bandwidth capacity of the BlueBird Block 1 satellites, required to achieve 24/7 continuous cellular broadband service coverage in the United States, with beams designed to support a capacity of up to 40 MHz, enabling peak data transmission speeds up to 120 Mbps, supporting voice, full data and video applications. The Block 2 BlueBirds, featuring as large as 2400 square foot communications arrays, will be the largest satellites ever commercially deployed in Low Earth orbit once launched. This launch will feature 3 satellites.

飞行时间线 Flight Timeline25 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:13
最大动压点Max-Q
Maximum dynamic pressure
T+02:27
主发动机关机MECO
Cut-off of the main engine
T+02:31
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:39
二级发动机第一次启动SES-1
First start of the second engine
T+03:22
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:16
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:39
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+08:02
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:30
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+08:32
一级着陆Stage 1 Landing
Landing of the first stage
T+46:00
二级发动机第二次启动SES-2
Second start of the second engine
T+46:06
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+54:27
载荷分离Payload Separation
Final deployment of the payload from the rocket
T+59:47
载荷分离Payload Separation
Final deployment of the payload from the rocket
T+01:05:07
载荷分离Payload Separation
Final deployment of the payload from the rocket

任务更新8

18:0806/17
Cosmic_Penguin · 06/17

Launch success with all satellites in contact.

↗ 链接
15:4706/17
Cosmic_Penguin · 06/17

All 3 satellites have been separated.

↗ 链接
14:3906/17
hitura-nobad · 06/17

Liftoff!

↗ 链接
14:2106/17
LL2 · 06/17

Unofficial Re-stream by SPACE AFFAIRS has started

↗ 链接
13:5406/17
Cosmic_Penguin · 06/17

Updated launch weather, 90% GO.

↗ 链接
19:3706/09
Cosmic_Penguin · 06/09

GO for launch.

↗ 链接
07:0505/07
Cosmic_Penguin · 05/06

NET mid-June.

↗ 链接
15:2511/15
Cosmic_Penguin · 11/15

Added launch.

↗ 链接