CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

05:4710/24 CST▶ 直播
任务档案 · MISSION

星链 6-61

SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
任务成功
▶ 观看直播

任务简介

一批23颗卫星用于Starlink巨型星座——SpaceX的太空互联网通信系统项目。

原文
SpaceX

A batch of 23 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.

飞行时间线 Flight Timeline23 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:10
最大动压点Max-Q
Maximum dynamic pressure
T+02:25
主发动机关机MECO
Cut-off of the main engine
T+02:29
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:36
二级发动机第一次启动SES-1
First start of the second engine
T+02:57
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:02
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:26
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:44
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:13
一级着陆Stage 1 Landing
Landing of the first stage
T+08:37
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+54:05
二级发动机第二次启动SES-2
Second start of the second engine
T+54:06
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+01:05:13
卫星组释放Starlink
Deployment of the Starlink stack from the rocket

任务更新21

06:5710/24
Cosmic_Penguin · 10/23

Launch success.

↗ 链接
05:4710/24
Cosmic_Penguin · 10/23

Liftoff.

↗ 链接
05:3710/24
LL2 · 10/23

Unofficial Webcast by SPACE AFFAIRS has started

↗ 链接
09:0110/23
Cosmic_Penguin · 10/23

Weather is 85% favorable for launch.

↗ 链接
08:2310/23
Cosmic_Penguin · 10/23

Scrubbed for the day.

↗ 链接
07:1410/23
Cosmic_Penguin · 10/22

New T-0.

↗ 链接
06:0610/23
juststephen · 10/22

Now targeting 23:48 UTC

↗ 链接
05:2010/23
Nosu · 10/22

Now targeting 23:28 UTC

↗ 链接
04:0010/23
hitura-nobad · 10/22

GO for launch.

↗ 链接
07:2210/22
Cosmic_Penguin · 10/21

Delayed to October 22 EDT.

↗ 链接
03:0310/22
Cosmic_Penguin · 10/21

New T-0.

↗ 链接
15:5310/21
Nosu · 10/21

Updated T-0

↗ 链接
11:2610/20
Cosmic_Penguin · 10/20

Tweaked T-0.

↗ 链接
01:4910/20
Cosmic_Penguin · 10/19

Weather is 70% favorable for launch.

↗ 链接
01:5110/18
Cosmic_Penguin · 10/17

NET October 21 per marine navigation warnings.

↗ 链接
12:5310/15
Cosmic_Penguin · 10/15

NET October 20 per marine navigation warnings.

↗ 链接
07:1510/14
Cosmic_Penguin · 10/13

Targeting NET October 19 UTC per NOTAMs F3809/24.

↗ 链接
00:3210/03
Cosmic_Penguin · 10/02

Postponed back to October TBD with cancellation of marine navigation warnings.

↗ 链接
11:0310/02
Cosmic_Penguin · 10/02

Targeting NET October 5 per marine navigation warnings.

↗ 链接
13:0209/29
Cosmic_Penguin · 09/29

Postponed to October TBD.

↗ 链接
10:2209/27
Cosmic_Penguin · 09/27

Added launch.

↗ 链接