CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

05:5203/31 CST▶ 直播
任务档案 · MISSION

Eutelsat 36D

SpaceX · 猎鹰 9 Block 5 · 39A 号发射工位 (LC-39A)

成功
任务成功
▶ 观看直播

任务简介

Eutelsat 36D 是 Eutelsat 规划的新一代多任务地球静止通信卫星,用于替换并增强东经36度(Eutelsat 在非洲、俄罗斯和欧洲地区进行电视广播(DTH)和政府服务的关键轨道位置)的容量。 该卫星基于空客 Eurostar-Neo 平台,发电能力为 18 kW,具备电推轨道提升(EOR)能力,发射质量 5 吨。 Eutelsat 36D 配备 70 个 Ku 波段转发器,覆盖五个下行波束和一个可操纵天线,提供灵活性和性能优化,可在非洲、俄罗斯和欧洲提供服务,运行寿命超过 15 年。

原文
SpaceX

Eutelsat 36D is a planned new generation multi-mission geostationary telecommunications satellite for Eutelsat, replacing and enhance capacity at 36° East, a key orbital slot for Eutelsat for TV broadcasting (DTH) and government services over Africa, Russia, and Europe. It is based on the Airbus Eurostar-Neo platform, with electric power generation capability of 18 kW, EOR (Electric Orbit Raising) capability, and a launch mass of 5 tons. With 70 Ku-band transponders over five downlink beams and a steerable antenna, Eutelsat 36D provides flexibility and performance optimisation to deliver service in Africa, Russia and Europe for an operational lifetime of more than 15 years.

飞行时间线 Flight Timeline23 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:14
最大动压点Max-Q
Maximum dynamic pressure
T+02:30
主发动机关机MECO
Cut-off of the main engine
T+02:34
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:42
二级发动机第一次启动SES-1
First start of the second engine
T+03:26
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:18
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:43
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+08:07
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+08:12
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:36
一级着陆Stage 1 Landing
Landing of the first stage
T+26:45
二级发动机第二次启动SES-2
Second start of the second engine
T+27:46
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+33:57
卫星释放EUTELSAT 36D
Deployment of the EUTELSAT 36D spacecraft from the rocket

任务更新14

11:3103/31
Cosmic_Penguin · 03/31

Launch success and satellite now in operation.

↗ 链接
05:5203/31
hitura-nobad · 03/30

Liftoff

↗ 链接
05:3203/31
LL2 · 03/30

Unofficial Re-stream by SPACE AFFAIRS has started

↗ 链接
04:5403/31
LL2 · 03/30

Unofficial Webcast by Spaceflight Now has started

↗ 链接
09:0903/30
Cosmic_Penguin · 03/30

GO for launch.

↗ 链接
00:4803/30
hitura-nobad · 03/29

Weather >95% GO

↗ 链接
01:0303/27
Cosmic_Penguin · 03/26

Refined launch window.

↗ 链接
20:5203/25
Cosmic_Penguin · 03/25

Updated launch window per marine navigation warnings.

↗ 链接
16:4303/24
Nosu · 03/24

Updating pad and approximate window

↗ 链接
16:4003/24
Nosu · 03/24

Updating pad and approximate window

↗ 链接
01:4603/22
Nosu · 03/21

Adding approximate launch time on March 30

↗ 链接
02:1403/20
Cosmic_Penguin · 03/19

NET March 29.

↗ 链接
09:4803/04
Cosmic_Penguin · 03/04

Updated launch pad.

↗ 链接
15:4502/24
Cosmic_Penguin · 02/24

Added launch.

↗ 链接