CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

06:5009/18 CST▶ 直播
任务档案 · MISSION

Galileo L13 (FOC FM26 & FM32)

SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
任务成功
▶ 观看直播

任务简介

两颗欧洲伽利略导航系统卫星。原计划由联盟号-ST火箭发射,后改为阿丽亚娜6号,但两者均不可用。 伽利略系统为欧洲提供了美国GPS和俄罗斯GLONASS星座的替代方案,但将与这两个系统实现互操作。

原文
SpaceX

Two satellites for Europe's Galileo navigation system. Originally planned for launch on Soyuz-ST and then Ariane 6 but both were unavailable. Galileo provides Europe with an alternative to the American GPS and Russian GLONASS constellations, but will be interoperable with both systems.

飞行时间线 Flight Timeline23 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:11
最大动压点Max-Q
Maximum dynamic pressure
T+02:31
主发动机关机MECO
Cut-off of the main engine
T+02:34
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:41
二级发动机第一次启动SES-1
First start of the second engine
T+03:24
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:20
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:38
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+08:13
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:27
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+08:34
一级着陆Stage 1 Landing
Landing of the first stage
T+03:26:52
二级发动机第二次启动SES-2
Second start of the second engine
T+03:27:21
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+03:34:22
载荷分离Payload Separation
Final deployment of the payload from the rocket

任务更新21

13:4109/18
Nosu · 09/18

Launch success.

↗ 链接
10:2809/18
Cosmic_Penguin · 09/18

Payload deployment confirmed.

↗ 链接
07:0109/18
Cosmic_Penguin · 09/17

Updated T-0.

↗ 链接
06:5109/18
Cosmic_Penguin · 09/17

Liftoff.

↗ 链接
06:2709/18
LL2 · 09/17

Unofficial Re-stream by SPACE AFFAIRS has started

↗ 链接
23:5409/17
Cosmic_Penguin · 09/17

GO for launch.

↗ 链接
23:5909/16
Nosu · 09/16

Weather is 40% favorable for launch.

↗ 链接
08:1309/16
Cosmic_Penguin · 09/16

NET September 17.

↗ 链接
00:0209/16
Nosu · 09/15

Weather is 50% favorable for launch.

↗ 链接
01:3509/15
Cosmic_Penguin · 09/14

NET September 16 per new NOTAMs.

↗ 链接
12:4609/14
Cosmic_Penguin · 09/14

Tweaked T-0.

↗ 链接
21:4009/04
Cosmic_Penguin · 09/04

NET September 15 (launch window per https://forum.nasaspaceflight.com/index.php?topic=60787.msg2620952#msg2620952)

↗ 链接
00:3709/03
Cosmic_Penguin · 09/02

Tweaked T-0.

↗ 链接
22:0609/02
Cosmic_Penguin · 09/02

Added launch window per marine navigation warnings.

↗ 链接
19:4509/02
Cosmic_Penguin · 09/02

NET September 9.

↗ 链接
10:0009/01
Cosmic_Penguin · 09/01

Targeting NET early September 2024.

↗ 链接
07:5005/31
Cosmic_Penguin · 05/30

NET September 13.

↗ 链接
12:1204/29
Cosmic_Penguin · 04/29

NET September 2024.

↗ 链接
23:1611/07
Cosmic_Penguin · 11/07

NET July 2024.

↗ 链接
17:3110/05
Nosu · 10/05

Moving the launch to Falcon 9 TBD 2024 pending official confirmation

↗ 链接
16:4701/08
Nosu · 01/08

Adding the launch

↗ 链接