CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

00:1012/06 CST▶ 直播
任务档案 · MISSION

Sirius SXM-9

SpaceX · 猎鹰 9 Block 5 · 39A 号发射工位 (LC-39A)

成功
任务成功
▶ 观看直播

任务简介

SXM-9 是 Maxar(SSL)为 SiriusXM 建造的第 10 颗高功率数字音频广播卫星。SXM-9 卫星将基于 Maxar 成熟的 1300 系列平台,并在该公司位于加利福尼亚州帕洛阿尔托的制造工厂建造。预计 SXM-9 将于 2024 年发射。SXM-9 配备了一个直径近 10 米的大型网状可展开反射器,使 SiriusXM 节目能够传输到其收音机(包括移动车辆中的收音机)。

原文
SpaceX

SXM-9 is the 10th high-powered, digital, audio radio satellite built by Maxar (SSL) for SiriusXM. The SXM-9 satellite will be based on Maxar’s proven 1300-class platform and built at the company’s manufacturing facility in Palo Alto, California. It is expected that SXM-9 will launch in 2024. SXM-9 has a large, mesh, unfurlable reflector almost 10 meters in diameter that allows SiriusXM programming to reach its radios, including those in moving vehicles.

飞行时间线 Flight Timeline21 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:12
最大动压点Max-Q
Maximum dynamic pressure
T+02:30
主发动机关机MECO
Cut-off of the main engine
T+02:34
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:41
二级发动机第一次启动SES-1
First start of the second engine
T+03:27
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:17
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:42
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+08:06
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+08:07
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:21
一级着陆Stage 1 Landing
Landing of the first stage
T+31:52
载荷分离Payload Separation
Final deployment of the payload from the rocket

任务更新16

11:1312/06
Cosmic_Penguin · 12/06

Launch success.

↗ 链接
00:4512/06
Cosmic_Penguin · 12/05

Spacecraft separation.

↗ 链接
00:1012/06
Cosmic_Penguin · 12/05

Liftoff.

↗ 链接
23:5512/05
LL2 · 12/05

Unofficial Re-stream by SPACE AFFAIRS has started

↗ 链接
05:5512/05
Cosmic_Penguin · 12/04

Go for launch.

↗ 链接
23:0812/03
Cosmic_Penguin · 12/03

Updating launch weather.

↗ 链接
01:4211/28
Cosmic_Penguin · 11/27

Added launch window.

↗ 链接
13:5211/27
Cosmic_Penguin · 11/27

Added tentative launch window.

↗ 链接
10:3411/26
Cosmic_Penguin · 11/26

Reverted back to NET early December.

↗ 链接
21:3811/24
hitura-nobad · 11/24

Updated launch pad.

↗ 链接
05:1411/21
hitura-nobad · 11/20

Targeting around 11 a.m. local on Dec 2 for liftoff.

↗ 链接
23:4111/14
Cosmic_Penguin · 11/14

NET December 2.

↗ 链接
15:2011/09
Cosmic_Penguin · 11/09

NET early December.

↗ 链接
11:2410/20
Cosmic_Penguin · 10/20

NET late November.

↗ 链接
11:5108/24
Cosmic_Penguin · 08/24

NET October.

↗ 链接
00:0008/01
Cosmic_Penguin · 07/31

Added launch.

↗ 链接