✓
任务成功
载荷已部署入轨。
05:0407/02 CST▶ 直播
任务档案 · MISSION
MTG-S1
SpaceX · 猎鹰 9 Block 5 · 39A 号发射工位 (LC-39A)

成功
▶ 观看直播任务成功
飞行时间线 Flight Timeline23 节点
T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:12
最大动压点Max-Q
Maximum dynamic pressure
T+02:28
主发动机关机MECO
Cut-off of the main engine
T+02:31
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:39
二级发动机第一次启动SES-1
First start of the second engine
T+03:24
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:11
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:34
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:59
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:01
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+08:28
一级着陆Stage 1 Landing
Landing of the first stage
T+26:54
二级发动机第二次启动SES-2
Second start of the second engine
T+28:00
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+35:11
载荷分离Payload Separation
Final deployment of the payload from the rocket
任务更新16 条
06:4307/02
Spacecraft in operation.
↗ 链接05:4007/02
Spacecraft separation.
↗ 链接05:0407/02
Liftoff.
↗ 链接04:4407/02
Unofficial Re-stream by SPACE AFFAIRS has started
↗ 链接11:4207/01
GO for launch.
↗ 链接04:0907/01
Updated launch weather, 20% GO.
↗ 链接10:2106/28
Swapped launch pad.
↗ 链接08:1506/27
Tweaked launch window.
↗ 链接05:1106/24
NET July 1st.
↗ 链接14:2306/23
Launch pad assigned.
↗ 链接09:1409/26
NET July 2025.
↗ 链接04:5906/28
Updating launch vehicle from Ariane 64 to Falcon 9
↗ 链接10:0012/15
NET H1 2025.
↗ 链接23:0510/12
NET 2025
↗ 链接03:1408/21
NET Q4 2024
↗ 链接22:5003/31
NET Q3 2024
↗ 链接