CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

13:2111/17 CST▶ 直播
任务档案 · MISSION

Sentinel-6B

SpaceX · 猎鹰 9 Block 5 · 4E 号发射工位 (SLC-4E)

成功
任务成功
▶ 观看直播

任务简介

Sentinel-6 Michael Freilich(2020年11月发射)和Sentinel-6B组成Sentinel-6任务,也称为Jason连续性服务(Jason-CS),是NASA、NOAA、ESA和EUMETSAT的合作项目。该任务延续了自1992年首颗Jason卫星开始的长期全球海面高度数据记录。

原文
Sentinel-6SpaceX

The Sentinel-6 Michael Freilich (launched November 2020) and Sentinel-6B make up the Sentinel-6 mission, also known as Jason Continuity of Service (Jason-CS), which is a partnership between NASA, NOAA, ESA, and EUMETSAT. This mission continues the long-term global sea surface height data record begun by first Jason satellites in 1992.

飞行时间线 Flight Timeline25 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:12
最大动压点Max-Q
Maximum dynamic pressure
T+02:13
主发动机关机MECO
Cut-off of the main engine
T+02:17
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:25
二级发动机第一次启动SES-1
First start of the second engine
T+02:30
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+02:48
整流罩分离Fairing Separation
Separation of the payload fairing
T+03:18
助推器返回关机Booster Boostback Burn Shutdown
End of the booster boostback burn
T+07:22
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+07:48
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+08:18
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+08:42
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+09:11
一级着陆Stage 1 Landing
Landing of the first stage
T+52:02
二级发动机第二次启动SES-2
Second start of the second engine
T+52:12
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+57:13
载荷分离Payload Separation
Final deployment of the payload from the rocket

载荷1

Low Earth Orbit

任务更新17

19:2611/17
hitura-nobad · 11/17

Launch successful

↗ 链接
14:2011/17
hitura-nobad · 11/17

Sentinel-6B deployed

↗ 链接
13:2211/17
hitura-nobad · 11/17

Liftoff!

↗ 链接
12:3111/17
Cosmic_Penguin · 11/17

Updated launch weather, 90% GO.

↗ 链接
12:2811/17
LL2 · 11/17

Official Webcast by NASA has started

↗ 链接
07:0011/17
Cosmic_Penguin · 11/16

Tweaked T-0.

↗ 链接
05:2911/16
Cosmic_Penguin · 11/15

Updated launch weather, 40% GO.

↗ 链接
05:1311/16
Cosmic_Penguin · 11/15

Tweaked T-0.

↗ 链接
06:0311/08
Cosmic_Penguin · 11/07

GO for launch.

↗ 链接
02:1611/07
Cosmic_Penguin · 11/06

Added launch window per marine navigation warnings.

↗ 链接
21:2109/24
Cosmic_Penguin · 09/24

Reverted back to November 16.

↗ 链接
21:0009/22
Cosmic_Penguin · 09/22

NET November 17.

↗ 链接
11:1808/08
Cosmic_Penguin · 08/08

NET November 16.

↗ 链接
07:3106/04
Cosmic_Penguin · 06/03

NET November.

↗ 链接
03:1212/19
Cosmic_Penguin · 12/18

NET late 2025.

↗ 链接
10:2509/08
Cosmic_Penguin · 09/08

NET November 2026.

↗ 链接
06:0812/21
Jay · 12/20

Adding launch

↗ 链接