CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

14:1010/15 CST▶ 直播
任务档案 · MISSION

星链 10-10

SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
任务成功
▶ 观看直播

任务简介

一批23颗卫星用于Starlink巨型星座——SpaceX的太空互联网通信系统项目。

原文
SpaceX

A batch of 23 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.

飞行时间线 Flight Timeline23 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:10
最大动压点Max-Q
Maximum dynamic pressure
T+02:26
主发动机关机MECO
Cut-off of the main engine
T+02:30
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:37
二级发动机第一次启动SES-1
First start of the second engine
T+02:56
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:09
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:30
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:52
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:15
一级着陆Stage 1 Landing
Landing of the first stage
T+08:39
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+54:51
二级发动机第二次启动SES-2
Second start of the second engine
T+54:52
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+01:03:44
卫星组释放Starlink
Deployment of the Starlink stack from the rocket

任务更新21

15:1810/15
Cosmic_Penguin · 10/15

Launch success.

↗ 链接
14:1110/15
hitura-nobad · 10/15

Liftoff

↗ 链接
14:0110/15
LL2 · 10/15

Unofficial Re-stream by SPACE AFFAIRS has started

↗ 链接
12:4410/15
Cosmic_Penguin · 10/15

Now targeting Oct 15 at 06:10 UTC.

↗ 链接
08:4910/15
Cosmic_Penguin · 10/15

GO for launch.

↗ 链接
22:0110/14
Cosmic_Penguin · 10/14

Weather is 95% favorable for launch.

↗ 链接
09:2810/14
Cosmic_Penguin · 10/14

Tweaked T-0.

↗ 链接
06:4610/14
Cosmic_Penguin · 10/13

Updated T-0.

↗ 链接
23:4110/13
Cosmic_Penguin · 10/13

Weather is 90% favorable for launch.

↗ 链接
11:3910/12
Cosmic_Penguin · 10/12

Delayed due to slip with Europa Clipper.

↗ 链接
09:1510/09
Cosmic_Penguin · 10/09

Targeting NET October 14 per NOTAMs F3723/24.

↗ 链接
08:5710/08
Cosmic_Penguin · 10/08

No longer scheduled for NET October 11 with marine navigation warnings cancelled.

↗ 链接
12:1110/06
Cosmic_Penguin · 10/06

NET October 11 per new marine navigation warnings.

↗ 链接
14:4410/04
Cosmic_Penguin · 10/04

No longer scheduled for NET October 10.

↗ 链接
10:5910/02
Cosmic_Penguin · 10/02

Delayed to NET October 10.

↗ 链接
08:0010/01
Cosmic_Penguin · 10/01

Reverted back to October 4 per NOTAMs F3600/24.

↗ 链接
00:2910/01
Cosmic_Penguin · 09/30

NET October 5.

↗ 链接
08:2009/30
Cosmic_Penguin · 09/30

NET October 4 per marine navigation warnings.

↗ 链接
13:0709/29
Cosmic_Penguin · 09/29

Postponed to October TBD.

↗ 链接
07:0109/25
Cosmic_Penguin · 09/24

NET October 2 to accommodate slip for Dragon Crew-9 launch (note: launch window as indicated is incorrect, refer to NOTAMs F3506/24 for day-by-day slip).

↗ 链接
07:5109/24
Cosmic_Penguin · 09/23

Targeting NET September 30 per NOTAMs F3506/24.

↗ 链接