CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

14:1101/15 CST▶ 直播
任务档案 · MISSION

Blue Ghost Lunar Lander Mission 1 & Hakuto-R M2 “Resilience”

SpaceX · 猎鹰 9 Block 5 · 39A 号发射工位 (LC-39A)

成功
任务成功
▶ 观看直播

任务简介

Blue Ghost 是 Firefly Aerospace 为 NASA 的 CLPS 计划开发的商业月球着陆器。Blue Ghost 设计可携带高达 155 公斤的有效载荷至月球表面。它将着陆于 Crisium 盆地的 Mare Crisium,设计寿命为 14 天,之后将在月夜中冻结。 Resilience 是日本私营公司 ispace 开发的 Hakuto-R 商业月球着陆器的第二次任务。该着陆器将携带 ispace 开发的小型月球车,用于研究月球表面。该月球车还计划根据 2020 年与 NASA 签署的合同收集月球风化层,其中公司将在月球上收集材料,然后“原位”将所有权转让给该机构。

原文
SpaceX

Blue Ghost is a commercial lunar lander developed by Firefly Aerospace for NASA’s CLPS program. Blue Ghost is designed to bring up to 155kg of payload to the lunar surface. It will land at Mare Crisium in the Crisium Basin and is designed to last 14 days before freezing in the lunar night. Resilience is the second mission of the Hakuto-R commercial lunar lander developed by private Japanese company ispace. The lander will carry a small rover developed by ispace to perform studies on the moon's surface. The rover is also expected to collect lunar regolith as part of a contract with NASA signed in 2020, in which companies will collect materials on the moon and then transfer ownership "in situ" to the agency.

飞行时间线 Flight Timeline26 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:12
最大动压点Max-Q
Maximum dynamic pressure
T+02:28
主发动机关机MECO
Cut-off of the main engine
T+02:31
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:38
二级发动机第一次启动SES-1
First start of the second engine
T+03:28
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:04
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:30
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:49
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+07:58
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:20
一级着陆Stage 1 Landing
Landing of the first stage
T+58:24
二级发动机第二次启动SES-2
Second start of the second engine
T+59:25
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+01:05:36
载荷分离Payload Separation
Final deployment of the payload from the rocket
T+01:26:15
二级发动机第三次启动SES-3
Third start of the second engine
T+01:26:16
二级发动机第三次关机SECO-3
Third cut-off of the second engine
T+01:32:42
载荷分离Payload Separation
Final deployment of the payload from the rocket

载荷2

MoonMoon

任务更新12

20:0801/15
Cosmic_Penguin · 01/15

Both lunar landers now in contact.

↗ 链接
15:4401/15
hitura-nobad · 01/15

Both Payloads deployed

↗ 链接
14:1201/15
hitura-nobad · 01/15

Liftoff

↗ 链接
14:0301/15
Cosmic_Penguin · 01/15

Tweaked T-0.

↗ 链接
00:4601/15
Nosu · 01/14

Weather is 90% favorable for launch.

↗ 链接
22:4101/14
Cosmic_Penguin · 01/14

Tweaked T-0.

↗ 链接
22:4001/07
Cosmic_Penguin · 01/07

GO for launch.

↗ 链接
22:3601/07
Cosmic_Penguin · 01/07

NET January 15.

↗ 链接
03:5212/12
Cosmic_Penguin · 12/11

Updated entry with Blue Ghost Mission 1 & HAKUTO-R M2 confirmed to be launching on the same rocket.

↗ 链接
10:4811/21
Cosmic_Penguin · 11/21

NET January.

↗ 链接
08:5009/23
Cosmic_Penguin · 09/23

NET Fall 2024.

↗ 链接
14:2407/18
Nosu · 07/18

NET May 2024

↗ 链接