✓
任务成功
载荷已部署入轨。
12:5301/28 CST▶ 直播
任务档案 · MISSION
GPS III SV09
SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
▶ 观看直播任务成功
飞行时间线 Flight Timeline13 节点
T+01:12
最大动压点Max-Q
Maximum dynamic pressure
T+02:29
主发动机关机MECO
Cut-off of the main engine
T+02:32
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:40
二级发动机第一次启动SES-1
First start of the second engine
T+03:29
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:10
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:39
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+08:05
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+08:10
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:34
一级着陆Stage 1 Landing
Landing of the first stage
T+01:03:30
二级发动机第二次启动SES-2
Second start of the second engine
T+01:04:18
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+01:29:19
载荷分离Payload Separation
Final deployment of the payload from the rocket
任务更新18 条
02:3201/29
Launch success.
↗ 链接14:2301/28
Spacecraft separation.
↗ 链接12:5301/28
Liftoff.
↗ 链接11:5801/28
Now targeting Jan 28 at 04:53 UTC
↗ 链接13:1601/27
Tweaked T-0.
↗ 链接02:1301/27
Delayed to January 27 LT.
↗ 链接09:4901/26
Tweaked T-0.
↗ 链接02:2401/25
Updated launch weather, 40% GO.
↗ 链接03:1801/24
Updated launch weather, 55% GO.
↗ 链接00:5801/24
Now targeting Jan 27 at 04:42 UTC
↗ 链接23:3901/22
GO for launch.
↗ 链接03:3301/21
NET January 26 UTC.
↗ 链接13:5101/15
Moved up to NET January.
↗ 链接11:5001/14
Launch pad assigned.
↗ 链接07:5601/14
Launch vehicle switched from Vulcan to Falcon.
↗ 链接07:5111/27
No more ULA (Vulcan) launches for 2025.
↗ 链接22:2509/08
NET November.
↗ 链接22:0306/09
Adding launch
↗ 链接