CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

14:0502/15 CST▶ 直播
任务档案 · MISSION

Nova-C IM-1

SpaceX · 猎鹰 9 Block 5 · 39A 号发射工位 (LC-39A)

成功
任务成功
▶ 观看直播

任务简介

这是直觉机器公司开发的Nova-C着陆器的首次飞行。该任务是CLPS计划的一部分,搭载了多个NASA有效载荷以支持阿尔忒弥斯月球计划,以及多个商业有效载荷。

原文
SpaceX

This is the first flight of Nova-C lander which was developed by Intuitive Machines. This mission is a part of CLPS program and carries various NASA payloads in support of Artemis lunar program, as well as multiple commercial payloads.

飞行时间线 Flight Timeline25 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:12
最大动压点Max-Q
Maximum dynamic pressure
T+02:14
主发动机关机MECO
Cut-off of the main engine
T+02:17
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:25
二级发动机第一次启动SES-1
First start of the second engine
T+02:30
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+03:06
整流罩分离Fairing Separation
Separation of the payload fairing
T+03:27
助推器返回关机Booster Boostback Burn Shutdown
End of the booster boostback burn
T+06:11
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:22
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:17
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+07:34
一级着陆Stage 1 Landing
Landing of the first stage
T+07:46
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+41:40
二级发动机第二次启动SES-2
Second start of the second engine
T+42:33
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+48:24
载荷分离Payload Separation
Final deployment of the payload from the rocket

载荷1

Moon

任务更新21

15:0402/15
Cosmic_Penguin · 02/15

Launch success and spacecraft AOS.

↗ 链接
14:0502/15
Cosmic_Penguin · 02/15

Liftoff.

↗ 链接
13:1102/15
LL2 · 02/15

Livestream has started

↗ 链接
12:2702/14
Cosmic_Penguin · 02/14

Scrubbed for the day.

↗ 链接
00:4502/14
Cosmic_Penguin · 02/13

Updated launch weather.

↗ 链接
15:5902/04
Cosmic_Penguin · 02/04

Tweaked T-0.

↗ 链接
11:3702/02
Cosmic_Penguin · 02/02

Added launch time.

↗ 链接
23:0201/23
Cosmic_Penguin · 01/23

NET February 14.

↗ 链接
15:0712/31
Cosmic_Penguin · 12/31

NET February 10.

↗ 链接
06:0312/20
Cosmic_Penguin · 12/19

NET mid-February 2024.

↗ 链接
02:3812/10
Cosmic_Penguin · 12/09

Added approximate launch time.

↗ 链接
07:2010/28
Cosmic_Penguin · 10/27

NET January 12, 2024.

↗ 链接
10:1810/27
Cosmic_Penguin · 10/27

No longer listed for mid-November 2023.

↗ 链接
07:3610/04
Cosmic_Penguin · 10/03

NET November 16.

↗ 链接
07:0908/15
Cosmic_Penguin · 08/14

NET November 15.

↗ 链接
04:2905/12
Nosu · 05/11

NET Q3 2023

↗ 链接
11:3002/07
Cosmic_Penguin · 02/07

NET June 2023

↗ 链接
16:2010/25
Nosu · 10/25

NET March 2023

↗ 链接
09:2509/03
Cosmic_Penguin · 09/03

NET January 2023

↗ 链接
15:1506/02
Nosu · 06/02

NET December 22

↗ 链接
06:1003/26
Nosu · 03/25

Q3 2022

↗ 链接