CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

06:2612/18 CST▶ 直播
任务档案 · MISSION

O3b mPower 7 & 8

SpaceX · 猎鹰 9 Block 5 · 39A 号发射工位 (LC-39A)

成功
任务成功
▶ 观看直播

任务简介

由波音公司建造、SES运营的十一颗高通量通信卫星星座中的第七颗和第八颗,部署于中地球轨道(MEO)。

原文
SpaceX

Seventh and eighth of a constellation of eleven high-throughput communications satellites in Medium Earth Orbit (MEO) built by Boeing and operated by SES.

飞行时间线 Flight Timeline26 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:11
最大动压点Max-Q
Maximum dynamic pressure
T+02:30
主发动机关机MECO
Cut-off of the main engine
T+02:33
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:41
二级发动机第一次启动SES-1
First start of the second engine
T+03:30
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:20
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:46
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:58
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+08:10
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:33
一级着陆Stage 1 Landing
Landing of the first stage
T+27:00
二级发动机第二次启动SES-2
Second start of the second engine
T+27:32
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+01:49:35
二级发动机第三次启动SES-3
Third start of the second engine
T+01:50:04
二级发动机第三次关机SECO-3
Third cut-off of the second engine
T+01:53:05
载荷分离Payload Separation
Final deployment of the payload from the rocket
T+02:00:15
载荷分离Payload Separation
Final deployment of the payload from the rocket

任务更新22

09:2612/18
Cosmic_Penguin · 12/18

Launch success.

↗ 链接
08:3012/18
Cosmic_Penguin · 12/18

Spacecrafts separation.

↗ 链接
06:2612/18
hitura-nobad · 12/17

Liftoff

↗ 链接
06:1112/18
LL2 · 12/17

Unofficial Re-stream by SPACE AFFAIRS has started

↗ 链接
05:0012/18
hitura-nobad · 12/17

Now targeting Dec 17 at 22:26 UTC

↗ 链接
04:1012/18
hitura-nobad · 12/17

Now targeting Dec 17 at 22:00 UTC

↗ 链接
12:3712/17
Cosmic_Penguin · 12/17

GO for launch.

↗ 链接
01:0312/17
hitura-nobad · 12/16

Weather is 55% favorable for launch.

↗ 链接
22:5912/15
Cosmic_Penguin · 12/15

Tweaked launch window.

↗ 链接
09:0912/15
Cosmic_Penguin · 12/15

NET December 17.

↗ 链接
02:3812/14
Cosmic_Penguin · 12/13

Delayed to NET December 16.

↗ 链接
22:0412/12
Cosmic_Penguin · 12/12

Tweaked launch window.

↗ 链接
09:5412/11
Cosmic_Penguin · 12/11

Delayed to December 15 per marine navigation warnings.

↗ 链接
09:5112/08
Cosmic_Penguin · 12/08

NET December 13 per marine navigation warnings.

↗ 链接
10:3312/07
Cosmic_Penguin · 12/07

Tweaked launch window.

↗ 链接
13:3112/06
Cosmic_Penguin · 12/06

NET December 12.

↗ 链接
13:5411/27
Cosmic_Penguin · 11/27

Changed launch pad.

↗ 链接
15:1711/07
Cosmic_Penguin · 11/07

NET December.

↗ 链接
19:2410/31
Cosmic_Penguin · 10/31

NET 2H 2024.

↗ 链接
21:5103/04
Nosu · 03/04

NET H2 2023

↗ 链接
02:1801/10
Cosmic_Penguin · 01/09

NET 1H 2023

↗ 链接
17:1108/10
Nosu · 08/10

NET 2023

↗ 链接