CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

23:4308/01 CST▶ 直播
任务档案 · MISSION

Crew-11

SpaceX · 猎鹰 9 Block 5 · 39A 号发射工位 (LC-39A)

成功
任务成功
▶ 观看直播

任务简介

SpaceX Crew-11 是 NASA 商业载人计划下,Crew Dragon 飞船前往国际空间站的第十一次载人运行飞行。

原文
SpaceX

SpaceX Crew-11 is the eleventh crewed operational flight of a Crew Dragon spacecraft to the International Space Station as part of NASA's Commercial Crew Program.

飞行时间线 Flight Timeline26 节点

T−45:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−42:00
机组登舱臂收回Crew Access Arm Retract
Retraction of the crew access arm from the rocket
T−39:00
发射逃逸系统 (LES) 武装Dragon
Dragon's launch escape system is armed
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−05:00
切换内部电源Dragon
Dragon transitions to internal power
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:12
最大动压点Max-Q
Maximum dynamic pressure
T+02:24
主发动机关机MECO
Cut-off of the main engine
T+02:27
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:35
二级发动机第一次启动SES-1
First start of the second engine
T+02:41
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+03:28
助推器返回关机Booster Boostback Burn Shutdown
End of the booster boostback burn
T+06:20
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:33
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:20
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+07:43
一级着陆Stage 1 Landing
Landing of the first stage
T+08:46
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+09:37
飞船与二级分离Dragon
Dragon separates from the second stage
T+10:25
头锥开启Dragon
Start of the opening sequence of Dragon's nosecone

任务更新19

00:0408/02
hitura-nobad · 08/01

Nosecone open. Launch success.

↗ 链接
23:4408/01
hitura-nobad · 08/01

Liftoff!!

↗ 链接
23:3108/01
hitura-nobad · 08/01

Updating Weather POG to 40%

↗ 链接
20:0608/01
Cosmic_Penguin · 08/01

Updated launch weather, 60% GO.

↗ 链接
19:3208/01
LL2 · 08/01

Official Webcast by NASA has started

↗ 链接
01:3408/01
Cosmic_Penguin · 07/31

Tweaked T-0.

↗ 链接
01:3308/01
hitura-nobad · 07/31

Weather is 75% favorable for launch.

↗ 链接
00:3308/01
hitura-nobad · 07/31

Now targeting August 1st at 15:43 UTC.

↗ 链接
00:0908/01
hitura-nobad · 07/31

Standown due to weather rules.

↗ 链接
20:0007/31
LL2 · 07/31

Official Webcast by NASA has started

↗ 链接
00:0407/31
hitura-nobad · 07/30

Adjusting Second. Now targeting Jul 31 at 16:09:24 UTC.

↗ 链接
21:1407/30
Cosmic_Penguin · 07/30

Updated launch weather, 90% GO.

↗ 链接
00:1907/30
hitura-nobad · 07/29

Weather is 85% favorable for launch.

↗ 链接
12:5707/19
Cosmic_Penguin · 07/19

Tweaked T-0.

↗ 链接
00:0907/11
Cosmic_Penguin · 07/10

Added tentative launch time.

↗ 链接
11:4607/01
Cosmic_Penguin · 07/01

Reverted back to NET July TBD.

↗ 链接
21:4905/28
Cosmic_Penguin · 05/28

NET July 31.

↗ 链接
02:5905/15
Cosmic_Penguin · 05/14

NET late July.

↗ 链接
02:2310/16
Cosmic_Penguin · 10/15

NET July 2025.

↗ 链接