CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

18:1502/13 CST▶ 直播
任务档案 · MISSION

Crew-12

SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
任务成功
▶ 观看直播

任务简介

SpaceX Crew-12 是载人龙飞船作为 NASA 商业载人计划的一部分,前往国际空间站的第十二次载人运营飞行。

原文
SpaceX

SpaceX Crew-12 is the twelfth crewed operational flight of a Crew Dragon spacecraft to the International Space Station as part of NASA's Commercial Crew Program.

飞行时间线 Flight Timeline27 节点

T−45:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−42:00
机组登舱臂收回Crew Access Arm Retract
Retraction of the crew access arm from the rocket
T−39:00
发射逃逸系统 (LES) 武装Dragon
Dragon's launch escape system is armed
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−05:00
切换内部电源Dragon
Dragon transitions to internal power
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:12
最大动压点Max-Q
Maximum dynamic pressure
T+02:24
主发动机关机MECO
Cut-off of the main engine
T+02:27
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:31
一级翻转机动Stage 1 Flip
Flip maneuver of the first stage
T+02:35
二级发动机第一次启动SES-1
First start of the second engine
T+02:41
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+03:27
助推器返回关机Booster Boostback Burn Shutdown
End of the booster boostback burn
T+06:20
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:33
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:17
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+07:42
一级着陆Stage 1 Landing
Landing of the first stage
T+08:47
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+09:37
飞船与二级分离Dragon
Dragon separates from the second stage
T+10:25
头锥开启Dragon
Start of the opening sequence of Dragon's nosecone

任务更新13

18:3002/13
hitura-nobad · 02/13

Launch successful.

↗ 链接
18:1602/13
hitura-nobad · 02/13

Liftoff!

↗ 链接
16:1402/13
LL2 · 02/13

Official Webcast by NASA has started

↗ 链接
03:4402/13
hitura-nobad · 02/12

Adjusted T-0

↗ 链接
22:1802/12
Cosmic_Penguin · 02/12

Updated launch weather, 90% GO.

↗ 链接
00:1202/12
Cosmic_Penguin · 02/11

Updated launch weather, 85% GO.

↗ 链接
21:5202/10
Cosmic_Penguin · 02/10

Delayed to February 13 due to ascent abort contingency weather.

↗ 链接
22:5202/09
Cosmic_Penguin · 02/09

Delayed to February 12 due to ascent abort contingency weather.

↗ 链接
07:3502/05
Cosmic_Penguin · 02/04

Tweaked T-0.

↗ 链接
05:4702/04
Cosmic_Penguin · 02/03

Tweaked T-0.

↗ 链接
02:3301/29
Cosmic_Penguin · 01/28

Moving up to NET February 11, pending final confirmation.

↗ 链接
14:0001/13
Cosmic_Penguin · 01/13

Launch pad assigned.

↗ 链接
06:5411/21
Cosmic_Penguin · 11/20

Rescheduled for NET 15 February 2026.

↗ 链接