✓
任务成功
载荷已部署入轨。
01:0408/23 CST▶ 直播
任务档案 · MISSION
星链 17-6
SpaceX · 猎鹰 9 Block 5 · 4E 号发射工位 (SLC-4E)

成功
▶ 观看直播任务成功
任务简介
一批24颗卫星用于Starlink巨型星座——SpaceX的太空互联网通信系统项目。
原文
A batch of 24 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.
飞行时间线 Flight Timeline23 节点
T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:12
最大动压点Max-Q
Maximum dynamic pressure
T+02:26
主发动机关机MECO
Cut-off of the main engine
T+02:29
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:36
二级发动机第一次启动SES-1
First start of the second engine
T+02:55
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:07
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:29
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:57
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:20
一级着陆Stage 1 Landing
Landing of the first stage
T+08:39
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+53:44
二级发动机第二次启动SES-2
Second start of the second engine
T+53:45
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+01:02:36
卫星组释放Starlink
Deployment of the Starlink stack from the rocket
任务更新13 条
02:1408/23
Launch success.
↗ 链接01:0508/23
Liftoff.
↗ 链接00:5308/23
Unofficial Re-stream by SPACE AFFAIRS has started
↗ 链接23:5208/22
Now targeting Aug 22 at 17:04 UTC
↗ 链接04:3108/22
Now targeting Aug 22 at 17:02 UTC
↗ 链接12:1808/16
Now targeting Aug 22 at 15:44 UTC
↗ 链接00:3908/15
Setting GO.
↗ 链接23:5508/14
NET August 21.
↗ 链接00:4708/14
NET August 20.
↗ 链接00:0008/12
Delayed to NET August 19.
↗ 链接22:4408/08
GO for launch.
↗ 链接10:3408/07
Added launch window.
↗ 链接01:5708/02
Added launch.
↗ 链接