CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

17:0507/14 CST▶ 直播
任务档案 · MISSION

Chandrayaan-3

印度空间研究组织 (ISRO) · Launch Vehicle Mark-3 (GSLV Mk III) · 萨蒂什·达万航天中心第二发射台

成功
任务成功
▶ 观看直播

任务简介

月船三号是印度的第三次探月任务。它基本重复了失败的月船二号任务,仅包含着陆器和巡视器。在受控下降后,着陆器将在月球表面指定地点进行软着陆并部署巡视器。六轮巡视器重约20公斤,依靠太阳能运行。它将在着陆点周围移动,进行月球表面化学分析,并通过轨道器将数据传回地球。着陆器将收集关于月震、月球表面热特性、月球表面等离子体密度和变化的数据。总体而言,月船三号任务将收集关于月球地形、矿物学、元素丰度、月球外逸层以及羟基和水冰迹象的科学信息。

原文
https://www.isro.gov.in/media_isro/pdf/Missions/LVM3/LVM3M4_Chandrayaan3_brochure.pdfChandrayaan-3

Chandrayaan-3 is India's third mission to the Moon. It repeats most of the failed Chandrayaan-2 mission, with only a lander and rover. After a controlled descent, the lander will perform a soft landing on the lunar surface at a specified site and deploy the rover. The six-wheeled rover weighs around 20 kg and will operate on solar power. It will move around the landing site, performing lunar surface chemical analysis and relaying data back to Earth through the orbiter. The lander will be collecting data on Moon-quakes, thermal properties of the lunar surface, the density and variation of lunar surface plasma. Altogether, the Chandrayaan-3 mission will collect scientific information on lunar topography, mineralogy, elemental abundance, lunar exosphere and signatures of hydroxyl and water-ice.

飞行时间线 Flight Timeline0 节点

尚未公开时间线。

载荷1

Moon

任务更新12

17:2207/14
Nosu · 07/14

Launch success confirmed

↗ 链接
17:0507/14
Nosu · 07/14

Liftoff

↗ 链接
16:3007/14
LL2 · 07/14

Livestream has started

↗ 链接
19:0307/13
Cosmic_Penguin · 07/13

Added T-0 seconds.

↗ 链接
20:2807/06
Cosmic_Penguin · 07/06

GO for launch.

↗ 链接
18:4207/05
Nosu · 07/05

Delayed to July 14 per NOTAM A1845/23

00:5706/29
Cosmic_Penguin · 06/28

Updated T-0.

↗ 链接
17:2106/28
Nosu · 06/28

NET July 13, per NOTAM A1766/23

01:1606/22
Cosmic_Penguin · 06/21

Added launch window.

↗ 链接
23:2105/21
Cosmic_Penguin · 05/21

NET July 12

↗ 链接
11:1805/07
Cosmic_Penguin · 05/07

NET July 2023.

↗ 链接
04:2210/21
Nosu · 10/20

NET June 2023

↗ 链接