CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

16:1504/21 CST▶ 直播
任务档案 · MISSION

Dragon CRS-2 SpX-32

SpaceX · 猎鹰 9 Block 5 · 39A 号发射工位 (LC-39A)

成功
任务成功
▶ 观看直播

任务简介

SpaceX执行的第32次国际空间站商业补给服务任务。该飞行将根据与NASA签订的第二份商业补给服务合同进行。 货运龙飞船2号携带补给和有效载荷,包括直接支持轨道实验室上进行的科学和研究调查的关键材料。

原文
SpaceX

32nd commercial resupply services mission to the International Space Station operated by SpaceX. The flight will be conducted under the second Commercial Resupply Services contract with NASA. Cargo Dragon 2 brings supplies and payloads, including critical materials to directly support science and research investigations that occur onboard the orbiting laboratory.

飞行时间线 Flight Timeline24 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−05:00
切换内部电源Dragon
Dragon transitions to internal power
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:08
最大动压点Max-Q
Maximum dynamic pressure
T+02:14
主发动机关机MECO
Cut-off of the main engine
T+02:17
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:18
二级发动机第一次启动SES-1
First start of the second engine
T+02:30
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+03:25
助推器返回关机Booster Boostback Burn Shutdown
End of the booster boostback burn
T+06:11
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:25
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:19
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+07:37
一级着陆Stage 1 Landing
Landing of the first stage
T+08:30
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+09:35
飞船与二级分离Dragon
Dragon separates from the second stage
T+10:23
头锥开启Dragon
Start of the opening sequence of Dragon's nosecone

任务更新12

16:3404/21
Cosmic_Penguin · 04/21

Launch success.

↗ 链接
16:1504/21
Cosmic_Penguin · 04/21

Liftoff.

↗ 链接
15:5204/21
LL2 · 04/21

Official Webcast by NASA has started

↗ 链接
19:5704/20
hitura-nobad · 04/20

Weather 95% GO.

↗ 链接
09:3804/20
Cosmic_Penguin · 04/20

Tweaked T-0.

↗ 链接
02:1004/19
Cosmic_Penguin · 04/18

Updated launch weather.

↗ 链接
05:2204/09
Nosu · 04/08

Adding seconds to T-0

↗ 链接
13:0603/25
Cosmic_Penguin · 03/25

Adjusted T-0. (Also see https://www.nasa.gov/news-release/nasa-invites-media-to-spacexs-32nd-resupply-launch-to-space-station/)

↗ 链接
01:5803/16
Cosmic_Penguin · 03/15

Added approximate launch time.

↗ 链接
05:5902/08
Nosu · 02/07

Targeting April 21

↗ 链接
15:1510/25
Cosmic_Penguin · 10/25

NET March 2025.

↗ 链接
08:1603/24
Cosmic_Penguin · 03/24

NET December 2024. (page SO-27)

↗ 链接