CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

12:0407/04 CST▶ 直播
任务档案 · MISSION

FLTA005 (Noise of Summer)

萤火虫航天 (Firefly) · Firefly Alpha · 2W 号发射工位 (SLC-2W)

成功
任务成功
▶ 观看直播

任务简介

萤火虫阿尔法小型卫星运载火箭的第五次飞行,为NASA的ELaNa 43(纳米卫星教育发射)任务搭载了八颗立方星。

原文
Noise of Summer

Fifth flight of the Firefly Alpha small sat launcher, carrying eight cubesats for NASA's ELaNa 43 (Educational Launch of a Nanosatellite) mission.

飞行时间线 Flight Timeline24 节点

T−18:00:00
载荷处理结束Payload Processing End
End of payload processing operations
T−17:30:00
载荷段准备Payload Segment Preparation
Preparation of the payload segment ahead of its mating with the rocket
T−17:00:00
载荷段运输Payload Segment Transport
Transport of the payload segment to the rocket
T−15:00:00
载荷段与火箭对接Payload Segment Mating
Mating of the payload segment to the rocket
T−09:00:00
发射台飞行配置Pad Configuration
Configuration of the pad for flight
T−07:30:00
运载器垂直竖立Launcher Vertical
Erection of the launch vehicle into a vertical position
T−05:00:00
推进系统最终检查Propulsion Checkouts
Final checkouts of the propulsion system ahead of launch
T−04:00:00
推进剂加注开始Prop Load
Start of propelland loading
T−01:05:00
补加LOX
Liquid oxygen topping off
T−20:00
各岗位就绪查询Ready Poll
Polling ready ahead of terminal count
T−15:00
终端倒数开始Terminal Count
Start of the terminal countdown towards launch
T−05:00
支撑臂收回Strongback
Retraction of the strongback arm ahead of liftoff
T−02:00
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:02
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+00:54
突破音速Supersonic
Vehicle is supersonic
T+01:05
最大动压点Max-Q
Maximum dynamic pressure
T+02:30
主发动机关机MECO
Cut-off of the main engine
T+02:33
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:35
二级发动机启动SES
Start of the second engine
T+02:45
整流罩分离Fairing Separation
Separation of the payload fairing
T+08:10
二级发动机关机SECO
Cut-off of the second engine
T+44:33
载荷部署序列开始Payload Deployment Sequence Start
Start of the payload deployment sequence
T+55:13
载荷部署序列结束Payload Deployment Sequence End
End of the payload deployment sequence.

任务更新24

14:1607/04
Cosmic_Penguin · 07/04

Launch success with all payloads deployed.

↗ 链接
12:0407/04
Cosmic_Penguin · 07/04

Liftoff.

↗ 链接
11:3107/04
LL2 · 07/04

Official Webcast by Firefly Aerospace has started

↗ 链接
07:4907/04
Cosmic_Penguin · 07/03

GO for launch.

↗ 链接
12:1707/03
Cosmic_Penguin · 07/03

NET July 4 UTC.

↗ 链接
08:0307/03
Cosmic_Penguin · 07/03

Delayed to evaluate data from scrubbed attempt; next launch attempt TBD.

↗ 链接
23:5607/02
Cosmic_Penguin · 07/02

GO for launch.

↗ 链接
12:2707/02
Cosmic_Penguin · 07/02

Scrubbed for the day.

↗ 链接
12:1407/02
Cosmic_Penguin · 07/02

Recycling for new attempt.

↗ 链接
12:0307/02
Cosmic_Penguin · 07/02

Hold at T-4s.

↗ 链接
11:2907/02
LL2 · 07/02

Official Webcast by Firefly Aerospace has started

↗ 链接
05:0206/30
Nosu · 06/29

Delayed by a day

↗ 链接
09:4706/27
Cosmic_Penguin · 06/27

NET June 30 local time.

↗ 链接
10:0406/26
Cosmic_Penguin · 06/26

Delayed to July 2 UTC.

↗ 链接
03:2506/25
Cosmic_Penguin · 06/24

Tweaked T-0.

↗ 链接
03:1406/22
Cosmic_Penguin · 06/21

Targeting June 27 UTC.

↗ 链接
07:4405/17
Cosmic_Penguin · 05/16

NET June.

↗ 链接
10:3410/13
Cosmic_Penguin · 10/13

NET March 2024.

↗ 链接
01:3406/01
Cosmic_Penguin · 05/31

NET August 2023.

↗ 链接
23:1405/06
Cosmic_Penguin · 05/06

NET July 2023.

↗ 链接
21:1901/15
Cosmic_Penguin · 01/15

NET February 2023

↗ 链接
11:2811/20
Cosmic_Penguin · 11/20

NET January 2023

↗ 链接
17:1807/18
Cosmic_Penguin · 07/18

NET November 2022

↗ 链接
01:4403/23
Nosu · 03/22

Adding launch

↗ 链接