CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

10:0208/12 CST▶ 直播
任务档案 · MISSION

Arctic Satellite Broadband Mission (ASBM)

SpaceX · 猎鹰 9 Block 5 · 4E 号发射工位 (SLC-4E)

成功
任务成功
▶ 观看直播

任务简介

ASBM(北极卫星宽带任务)1号和2号是两颗由诺斯罗普·格鲁曼公司为挪威航天局建造的双子卫星,与Inmarsat和挪威国防部合作。 它们旨在为北极地区的民用和军用用户提供移动宽带覆盖。 美国空军在ASBM卫星上提供极高频扩展数据速率有效载荷,作为增强极地系统资本重组(EPS-R)计划的一部分。

原文
SpaceXArctic Satellite Broadband Mission

ASBM (Arctic Satellite Broadband Mission) 1 & 2 are two twin satellites built by Northrop Grumman for Space Norway, in cooperation with Inmarsat and the Norwegian Ministry of Defence. They are designed to bring mobile broadband coverage in the Arctic for both civilians and military. The US Air Force provides the Extremely High Frequency eXtended Data Rate payloads on ASBM satellites as part of the Enhanced Polar System Recapitalization (EPS-R) program.

飞行时间线 Flight Timeline24 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:10
最大动压点Max-Q
Maximum dynamic pressure
T+02:32
主发动机关机MECO
Cut-off of the main engine
T+02:35
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:43
二级发动机第一次启动SES-1
First start of the second engine
T+03:23
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:22
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:45
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+08:14
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+08:17
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:39
一级着陆Stage 1 Landing
Landing of the first stage
T+36:47
二级发动机第二次启动SES-2
Second start of the second engine
T+37:27
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+42:28
载荷分离Payload Separation
Final deployment of the payload from the rocket
T+47:38
载荷分离Payload Separation
Final deployment of the payload from the rocket

任务更新15

20:5208/12
Cosmic_Penguin · 08/12

Launch success.

↗ 链接
10:5408/12
Cosmic_Penguin · 08/12

Both payload have been deployed.

↗ 链接
10:0308/12
Cosmic_Penguin · 08/12

Liftoff.

↗ 链接
09:4308/12
LL2 · 08/12

Unofficial Webcast by SPACE AFFAIRS has started

↗ 链接
08:4708/09
Cosmic_Penguin · 08/09

GO for launch.

↗ 链接
00:0708/05
Cosmic_Penguin · 08/04

Added tentative launch date and time.

↗ 链接
22:4607/12
Nosu · 07/12

Reverting to TBD July pending completion of the investigation into the Starlink Group 9-3 second engine failure

↗ 链接
11:1507/10
Cosmic_Penguin · 07/10

Targeting NET July 16 UTC per NOTAM B0564/24.

↗ 链接
07:5107/10
Cosmic_Penguin · 07/09

NET July 14 UTC.

↗ 链接
22:3604/29
Cosmic_Penguin · 04/29

NET late July.

↗ 链接
21:2904/02
Cosmic_Penguin · 04/02

NET Q3 2024.

↗ 链接
21:5711/21
Cosmic_Penguin · 11/21

NET mid-2024.

↗ 链接
10:1710/27
Cosmic_Penguin · 10/27

NET Q4 2023.

↗ 链接
10:1405/12
Cosmic_Penguin · 05/12

NET 2024.

↗ 链接
15:4506/09
Nosu · 06/09

Adding launch NET early 2023

↗ 链接