CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

00:3012/31 CST▶ 直播
任务档案 · MISSION

SPADEX (Space Docking Experiment)

印度空间研究组织 (ISRO) · PSLV-CA · 萨蒂什·达万航天中心第一发射台

成功
任务成功
▶ 观看直播

任务简介

SPADEX(空间对接实验)是印度空间研究组织(ISRO)的一项技术任务,旨在演示两艘航天器在轨自主对接。 该任务将涉及两艘航天器(追踪器和目标器)的交会对接,并测试组合航天器在对接状态下的姿态控制。随后,追踪器和目标器将分离以操作其他有效载荷。该任务对于ISRO未来载人航天和月球采样返回任务中发展交会对接能力至关重要。

原文
SpaDeX Missionwww.isro.gov.in

SPADEX (Space Docking Experiment) is an Indian Space Research Organisation (ISRO) technology mission to demonstrate autonomous docking between 2 spacecraft in orbit. The mission will involve two spacecraft (Chaser and Target) rendezvous and docking together, plus testing attitude control of the combined spacecraft under docked conditions. The Chaser and Target spacecraft will then be separated for operating other payload. The mission is critical to develop rendezvous and docking abilities for ISRO’s future human spaceflight and lunar sample return missions.

飞行时间线 Flight Timeline15 节点

T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:51
二级分离Stage 2 Separation
Separation of the second stage from the first
T+01:51
二级发动机启动SES
Start of the second engine
T+03:08
整流罩分离Fairing Separation
Separation of the payload fairing
T+04:22
三级分离Stage 3 Separation
Separation of the third stage from the second
T+04:23
三级发动机点火Stage 3 Ignition
Third stage engine ignites.
T+08:31
末级 (Kick Stage) 分离Kick Stage Separation
Separation of the kick stage from the previous stage
T+08:42
末级 (Kick Stage) 点火Kick Stage Ignition
Start of the kick stage engine
T+13:12
末级 (Kick Stage) 关机Kick Stage Cut-off
Cut-off of the kick stage engine
T+15:09
载荷分离Payload Separation
Final deployment of the payload from the rocket
T+15:12
载荷分离Payload Separation
Final deployment of the payload from the rocket
T+32:38
末级 (Kick Stage) 点火Kick Stage Ignition
Start of the kick stage engine
T+33:08
末级 (Kick Stage) 关机Kick Stage Cut-off
Cut-off of the kick stage engine
T+01:21:09
末级 (Kick Stage) 点火Kick Stage Ignition
Start of the kick stage engine
T+01:21:16
末级 (Kick Stage) 关机Kick Stage Cut-off
Cut-off of the kick stage engine

载荷2

Low Earth OrbitLow Earth Orbit

任务更新11

12:2812/31
Cosmic_Penguin · 12/31

Launch success.

↗ 链接
00:4612/31
hitura-nobad · 12/30

Both payloads deployed.

↗ 链接
00:3012/31
hitura-nobad · 12/30

Liftoff!

↗ 链接
00:0012/31
LL2 · 12/30

Official Webcast by ISRO Official has started

↗ 链接
14:2012/30
Cosmic_Penguin · 12/30

New T-0.

↗ 链接
18:3212/23
Cosmic_Penguin · 12/23

GO for launch.

↗ 链接
18:5912/21
Cosmic_Penguin · 12/21

Updated launch vehicle variant.

↗ 链接
23:4512/13
Cosmic_Penguin · 12/13

NET December 30 per new NOTAMs.

↗ 链接
00:5512/07
Cosmic_Penguin · 12/06

NET December 26.

↗ 链接
15:4911/09
Cosmic_Penguin · 11/09

Targeting December 20. (1:30:57 mark)

↗ 链接
14:3710/14
Cosmic_Penguin · 10/14

Added launch.

↗ 链接