CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

04:5503/22 CST▶ 直播
任务档案 · MISSION

Dragon CRS-2 SpX-30

SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
任务成功
▶ 观看直播

任务简介

SpaceX 执行的第 30 次国际空间站商业补给服务任务。此次飞行将根据与 NASA 签订的第二份商业补给服务合同进行。 货运龙飞船 2 号携带补给和有效载荷,包括直接支持轨道实验室上进行的科学和研究调查的关键材料。

原文
SpaceX

30th commercial resupply services mission to the International Space Station operated by SpaceX. The flight will be conducted under the second Commercial Resupply Services contract with NASA. Cargo Dragon 2 brings supplies and payloads, including critical materials to directly support science and research investigations that occur onboard the orbiting laboratory.

飞行时间线 Flight Timeline24 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−05:00
切换内部电源Dragon
Dragon transitions to internal power
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+00:58
最大动压点Max-Q
Maximum dynamic pressure
T+02:19
主发动机关机MECO
Cut-off of the main engine
T+02:22
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:29
二级发动机第一次启动SES-1
First start of the second engine
T+02:32
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+03:24
助推器返回关机Booster Boostback Burn Shutdown
End of the booster boostback burn
T+06:20
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:40
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:26
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+07:50
一级着陆Stage 1 Landing
Landing of the first stage
T+08:35
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+11:48
飞船与二级分离Dragon
Dragon separates from the second stage
T+12:40
头锥开启Dragon
Start of the opening sequence of Dragon's nosecone

任务更新15

05:2203/22
hitura-nobad · 03/21

Launch successful

↗ 链接
04:5503/22
hitura-nobad · 03/21

Liftoff

↗ 链接
04:3603/22
LL2 · 03/21

Official Webcast by NASA has started

↗ 链接
21:3803/20
Nosu · 03/20

Weather 90%

↗ 链接
09:5103/16
Cosmic_Penguin · 03/16

GO for launch.

↗ 链接
16:1903/15
Nosu · 03/15

Tweaked launch time

↗ 链接
18:3503/09
Cosmic_Penguin · 03/09

Added new tentative launch date & time.

↗ 链接
09:5003/04
Cosmic_Penguin · 03/04

Delayed to March TBD 2024.

↗ 链接
12:2302/26
Cosmic_Penguin · 02/26

Tweaked T-0.

↗ 链接
12:2102/26
Cosmic_Penguin · 02/26

Moved to SLC-40 for launch.

↗ 链接
01:0502/23
Nosu · 02/22

Targeting early March 12 UTC

↗ 链接
01:2602/20
Cosmic_Penguin · 02/19

NET March 13 UTC.

↗ 链接
07:3202/14
Cosmic_Penguin · 02/13

NET mid-March.

↗ 链接
09:3010/30
Cosmic_Penguin · 10/30

NET March 4, 2024.

↗ 链接
15:1009/20
Nosu · 09/20

Targeting February 2024

↗ 链接