CHX·Live
⌘K
UTC—/— —:—:

任务失利

任务未达成预期目标。

19:2504/19 CST▶ 直播
任务档案 · MISSION

BlueBird Block 2 #2

蓝色起源 · 新格伦号 · 36A 号发射工位 (LC-36A)

失利
任务失利 · 查看事故通报
▶ 观看直播

任务简介

AST SpaceMobile 的 Block 2 BlueBird 卫星设计提供高达 BlueBird Block 1 卫星 10 倍的带宽容量,以实现美国境内全天候连续蜂窝宽带服务覆盖,其波束设计支持高达 40 MHz 的容量,峰值数据传输速度可达 120 Mbps,支持语音、完整数据和视频应用。Block 2 BlueBird 卫星配备面积达 2400 平方英尺的通信阵列,一旦发射,将成为低地球轨道上商业部署的最大卫星。 本次发射将搭载 1 颗卫星:BlueBird 7/BlueBird Block 2 FM2。

原文
https://www.blueorigin.com/missions/ng-3

AST SpaceMobile’s Block 2 BlueBird satellites are designed to deliver up to 10 times the bandwidth capacity of the BlueBird Block 1 satellites, required to achieve 24/7 continuous cellular broadband service coverage in the United States, with beams designed to support a capacity of up to 40 MHz, enabling peak data transmission speeds up to 120 Mbps, supporting voice, full data and video applications. The Block 2 BlueBirds, featuring as large as 2400 square foot communications arrays, will be the largest satellites ever commercially deployed in Low Earth orbit once launched. This launch will feature 1 satellite, BlueBird 7/BlueBird Block 2 FM2.

事故描述

AST SpaceMobile 的 BlueBird 7 成功由蓝色起源的 New Glenn 火箭发射,但被送入不可用的较低轨道,尽管助推器成功着陆,卫星仍将离轨销毁。

飞行时间线 Flight Timeline27 节点

T−04:30:00
推进剂加注开始Prop Load
Start of propelland loading
T−45:00
推进剂加注完成Prop Load Complete
End of propellant loading
T−30:00
天气状况检查Weather Check
Check of the weather conditions for launch
T−17:00
各岗位就绪查询Ready Poll
Polling ready ahead of terminal count
T−04:00
终端倒数开始Terminal Count
Start of the terminal countdown towards launch
T−02:30
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−01:30
切换内部电源Internal Power
Launch vehicle switches to internal power sources
T−00:30
水帘降噪系统启动Water Deluge
Water deluge systems turn on
T−00:30
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−00:06
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:36
最大动压点Max-Q
Maximum dynamic pressure
T+03:05
主发动机关机MECO
Cut-off of the main engine
T+03:09
二级分离Stage 2 Separation
Separation of the second stage from the first
T+03:16
二级发动机第一次启动SES-1
First start of the second engine
T+03:42
整流罩分离Fairing Separation
Separation of the payload fairing
T+07:06
侧助推器再入减速点火Boosters Entry Burn Startup
Start of the boosters atmospheric entry burn
T+07:37
侧助推器再入减速关机Boosters Entry Burn Shutdown
End of the boosters atmospheric entry burn
T+08:45
侧助推器着陆减速Boosters Landing Burn
Start of the boosters landing burn
T+09:23
侧助推器着陆Boosters Landing
Landing of the boosters
T+13:01
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+01:09:41
二级发动机第二次启动SES-2
Second start of the second engine
T+01:10:49
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+01:15:44
载荷分离Payload Separation
Final deployment of the payload from the rocket
T+02:49:12
二级发动机第三次启动SES-3
Third start of the second engine
T+02:49:24
二级发动机第三次关机SECO-3
Third cut-off of the second engine
T+03:05:08
任务结束Mission End
End of the launch vehicle's mission

任务更新20

03:5504/20
Cosmic_Penguin · 04/19

Launch failure.

↗ 链接
21:4804/19
Cosmic_Penguin · 04/19

Spacecraft separation; launch outcome pending.

↗ 链接
19:2504/19
Cosmic_Penguin · 04/19

Liftoff.

↗ 链接
19:0504/19
Cosmic_Penguin · 04/19

New T-0.

↗ 链接
18:4204/19
Cosmic_Penguin · 04/19

Hold at T-3:57.

↗ 链接
17:4604/19
LL2 · 04/19

Unofficial Webcast by Spaceflight Now has started

↗ 链接
08:2904/18
Cosmic_Penguin · 04/18

Updated launch weather, 90% GO.

↗ 链接
04:3904/17
Cosmic_Penguin · 04/16

GO for launch.

↗ 链接
01:3504/16
Cosmic_Penguin · 04/15

NET April 19, TBC.

↗ 链接
04:1004/15
Cosmic_Penguin · 04/14

Delayed to NET April 18, TBC.

↗ 链接
21:5004/13
Cosmic_Penguin · 04/13

Delayed to NET April 17.

↗ 链接
01:1304/09
Cosmic_Penguin · 04/08

NET April 16.

↗ 链接
05:4604/04
Cosmic_Penguin · 04/03

NET April 14.

↗ 链接
20:3704/01
Cosmic_Penguin · 04/01

NET April 12 per air space closure notices.

↗ 链接
05:4503/30
Cosmic_Penguin · 03/29

NET April 10.

↗ 链接
17:5702/13
Cosmic_Penguin · 02/13

NET March.

↗ 链接
20:2601/22
Cosmic_Penguin · 01/22

Launch moved to New Glenn, NET late February.

↗ 链接
08:4312/22
Cosmic_Penguin · 12/22

NET January.

↗ 链接
06:2012/05
Cosmic_Penguin · 12/04

NET Q1 2026.

↗ 链接
15:2211/15
Cosmic_Penguin · 11/15

Added launch.

↗ 链接