CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

05:1207/23 CST▶ 直播
任务档案 · MISSION

O3b mPower 9-10

SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
任务成功
▶ 观看直播

任务简介

2颗由波音公司建造、SES运营的中地球轨道(MEO)高通量通信卫星。

原文
SpaceX

2 high-throughput communications satellites in Medium Earth Orbit (MEO) built by Boeing and operated by SES.

飞行时间线 Flight Timeline26 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:11
最大动压点Max-Q
Maximum dynamic pressure
T+02:26
主发动机关机MECO
Cut-off of the main engine
T+02:30
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:38
二级发动机第一次启动SES-1
First start of the second engine
T+03:21
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:14
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:41
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:51
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+08:11
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:35
一级着陆Stage 1 Landing
Landing of the first stage
T+26:55
二级发动机第二次启动SES-2
Second start of the second engine
T+27:27
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+01:49:36
二级发动机第三次启动SES-3
Third start of the second engine
T+01:50:03
二级发动机第三次关机SECO-3
Third cut-off of the second engine
T+01:53:14
载荷分离Payload Separation
Final deployment of the payload from the rocket
T+02:00:14
载荷分离Payload Separation
Final deployment of the payload from the rocket

任务更新18

08:4107/23
Cosmic_Penguin · 07/23

Launch success.

↗ 链接
07:1807/23
Cosmic_Penguin · 07/22

Spacecrafts separation.

↗ 链接
05:1207/23
hitura-nobad · 07/22

Liftoff!

↗ 链接
04:5407/23
LL2 · 07/22

Unofficial Re-stream by SPACE AFFAIRS has started

↗ 链接
04:4407/23
hitura-nobad · 07/22

Weather improved to 60% GO

↗ 链接
07:1507/22
Cosmic_Penguin · 07/21

Rescheduled for July 22.

↗ 链接
05:3307/22
SwGustav · 07/21

Scrub

↗ 链接
05:0807/22
LL2 · 07/21

Unofficial Re-stream by SPACE AFFAIRS has started

↗ 链接
05:0007/22
SwGustav · 07/21

Now targeting Jul 21 at 21:27 UTC

↗ 链接
21:2907/20
hitura-nobad · 07/20

Weather is 50% favorable for launch.

↗ 链接
09:5507/19
Cosmic_Penguin · 07/19

GO for launch.

↗ 链接
01:1307/17
Cosmic_Penguin · 07/16

Tweaked launch window.

↗ 链接
21:4607/15
Cosmic_Penguin · 07/15

NET July 21.

↗ 链接
01:4907/10
Cosmic_Penguin · 07/09

NET July.

↗ 链接
09:2107/03
Cosmic_Penguin · 07/03

NET Q3 with 2 satellites on board.

↗ 链接
15:0204/30
Cosmic_Penguin · 04/30

NET Summer 2025.

↗ 链接
15:1811/07
Cosmic_Penguin · 11/07

NET mid-2025.

↗ 链接
19:2410/31
Cosmic_Penguin · 10/31

NET 2025.

↗ 链接