CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

04:1911/08 CST▶ 直播
任务档案 · MISSION

星链 6-77

SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
任务成功
▶ 观看直播

任务简介

一批23颗卫星用于Starlink巨型星座——SpaceX的太空互联网通信系统项目。

原文
SpaceX

A batch of 23 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.

飞行时间线 Flight Timeline23 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:10
最大动压点Max-Q
Maximum dynamic pressure
T+02:25
主发动机关机MECO
Cut-off of the main engine
T+02:29
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:35
二级发动机第一次启动SES-1
First start of the second engine
T+02:57
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:02
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:26
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:43
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:11
一级着陆Stage 1 Landing
Landing of the first stage
T+08:37
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+54:00
二级发动机第二次启动SES-2
Second start of the second engine
T+54:02
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+01:05:08
卫星组释放Starlink
Deployment of the Starlink stack from the rocket

任务更新20

05:2911/08
Nosu · 11/07

Launch success

↗ 链接
04:4211/08
SwGustav · 11/07

Liftoff

↗ 链接
04:0911/08
LL2 · 11/07

Unofficial Re-stream by SPACE AFFAIRS has started

↗ 链接
03:4011/08
Nosu · 11/07

Now targeting Nov 07 at 20:19 UTC

↗ 链接
09:3511/07
Cosmic_Penguin · 11/07

Weather is 90% favorable for launch.

↗ 链接
08:1111/07
Cosmic_Penguin · 11/07

Scrubbed for the day.

↗ 链接
03:5411/07
hitura-nobad · 11/06

Now targeting Nov 07 at 00:39 UTC

↗ 链接
00:3611/07
Cosmic_Penguin · 11/06

New T-0.

↗ 链接
22:3011/05
Cosmic_Penguin · 11/05

Weather is 30% favorable for launch.

↗ 链接
11:1611/05
Cosmic_Penguin · 11/05

Delayed to November 6.

↗ 链接
07:3911/05
Cosmic_Penguin · 11/04

Go for launch on November 5.

↗ 链接
02:1911/05
hitura-nobad · 11/04

Now targeting Nov 05 at 21:27 UTC

↗ 链接
21:2611/04
Cosmic_Penguin · 11/04

Updated launch weather.

↗ 链接
08:2611/04
Cosmic_Penguin · 11/04

NET November 5 per NOTAMs F4151/24.

↗ 链接
05:5611/04
hitura-nobad · 11/03

Launch scrubbed due to helium issues with the first stage.

↗ 链接
05:4711/04
LL2 · 11/03

Unofficial Re-stream by SPACE AFFAIRS has started

↗ 链接
01:1911/04
Cosmic_Penguin · 11/03

GO for launch.

↗ 链接
21:2011/02
hitura-nobad · 11/02

Weather is 90% favorable for launch.

↗ 链接
17:5611/02
Cosmic_Penguin · 11/02

Tweaked launch window.

↗ 链接
00:1210/26
Cosmic_Penguin · 10/25

Targeting NET November 3 per NOTAMs A3425/24.

↗ 链接