CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

14:4303/15 CST▶ 直播
任务档案 · MISSION

运输者 13 (Dedicated SSO 拼车任务)

SpaceX · 猎鹰 9 Block 5 · 4E 号发射工位 (SLC-4E)

成功
任务成功
▶ 观看直播

任务简介

专为商业和政府客户提供的数十颗小型微卫星和纳米卫星的专用拼车飞行,目标为太阳同步轨道。

原文
SpaceX

Dedicated rideshare flight to a sun-synchronous orbit with dozens of small microsatellites and nanosatellites for commercial and government customers.

飞行时间线 Flight Timeline33 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:06
最大动压点Max-Q
Maximum dynamic pressure
T+02:14
主发动机关机MECO
Cut-off of the main engine
T+02:18
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:22
一级翻转机动Stage 1 Flip
Flip maneuver of the first stage
T+02:26
二级发动机第一次启动SES-1
First start of the second engine
T+02:31
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+03:07
整流罩分离Fairing Separation
Separation of the payload fairing
T+03:25
助推器返回关机Booster Boostback Burn Shutdown
End of the booster boostback burn
T+06:02
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:15
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:03
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+07:27
一级着陆Stage 1 Landing
Landing of the first stage
T+08:15
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+51:08
二级发动机第二次启动SES-2
Second start of the second engine
T+51:11
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+53:57
载荷部署序列开始Payload Deployment Sequence Start
Start of the payload deployment sequence
T+01:06:54
载荷部署序列结束Payload Deployment Sequence End
End of the payload deployment sequence.
T+01:42:23
二级发动机第三次启动SES-3
Third start of the second engine
T+01:42:24
二级发动机第三次关机SECO-3
Third cut-off of the second engine
T+02:14:31
二级发动机第四次启动SES-4
Fourth start of the second engine
T+02:14:32
二级发动机第四次关机SECO-4
Fourth cut-off of the second engine
T+02:17:33
载荷部署序列开始Payload Deployment Sequence Start
Start of the payload deployment sequence
T+02:22:42
载荷部署序列结束Payload Deployment Sequence End
End of the payload deployment sequence.

载荷1

Koonibba Test Range

任务更新15

17:0603/15
Cosmic_Penguin · 03/15

All satellites deployed nominally.

↗ 链接
14:4303/15
Cosmic_Penguin · 03/15

Liftoff.

↗ 链接
08:5903/15
Cosmic_Penguin · 03/15

New T-0.

↗ 链接
13:5103/14
Cosmic_Penguin · 03/14

T-0 is accurate to the second.

↗ 链接
10:1003/14
Cosmic_Penguin · 03/14

GO for launch.

↗ 链接
23:3503/11
Cosmic_Penguin · 03/11

NET March 15 UTC.

↗ 链接
07:4503/11
Cosmic_Penguin · 03/10

Delayed to NET March 14 UTC.

↗ 链接
16:4803/07
Cosmic_Penguin · 03/07

NET March 12 UTC.

↗ 链接
08:4403/05
Cosmic_Penguin · 03/05

Delayed to NET March 10 UTC.

↗ 链接
20:0203/03
Cosmic_Penguin · 03/03

NET March 9 UTC.

↗ 链接
07:1702/28
Cosmic_Penguin · 02/27

Delayed to NET March 6.

↗ 链接
21:2902/27
Cosmic_Penguin · 02/27

Tweaked launch window.

↗ 链接
16:0002/26
Cosmic_Penguin · 02/26

Added launch date and time.

↗ 链接
00:4202/05
Cosmic_Penguin · 02/04

NET March 3.

↗ 链接
10:4601/10
Cosmic_Penguin · 01/10

NET March 1.

↗ 链接