CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

06:2811/18 CST▶ 直播
任务档案 · MISSION

Optus-X/TD7

SpaceX · 猎鹰 9 Block 5 · 39A 号发射工位 (LC-39A)

成功
任务成功
▶ 观看直播

任务简介

由诺斯罗普·格鲁曼公司建造的一颗未公开的地球静止通信卫星,据称为澳大利亚电信运营商Optus所有。细节待定。

原文
SpaceX

An unannounced geostationary communication satellite built by Northrop Grumman, alleged for the Australian telecommunications operator Optus. Details TBD.

飞行时间线 Flight Timeline19 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:14
最大动压点Max-Q
Maximum dynamic pressure
T+02:31
主发动机关机MECO
Cut-off of the main engine
T+02:34
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:42
二级发动机第一次启动SES-1
First start of the second engine
T+03:25
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:15
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:42
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+08:23
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:48
一级着陆Stage 1 Landing
Landing of the first stage

任务更新11

09:3811/18
Cosmic_Penguin · 11/18

Launch success.

↗ 链接
06:2811/18
Cosmic_Penguin · 11/17

Liftoff.

↗ 链接
06:1211/18
LL2 · 11/17

Unofficial Webcast by SPACE AFFAIRS has started

↗ 链接
05:2011/18
Cosmic_Penguin · 11/17

Now targeting Nov 17 at 22:28 UTC

↗ 链接
05:1211/18
hitura-nobad · 11/17

Now targeting Nov 17 at 22:08 UTC

↗ 链接
04:4711/18
hitura-nobad · 11/17

Now targeting Nov 17 at 21:48 UTC

↗ 链接
06:1411/17
Nosu · 11/16

Setting GO

↗ 链接
23:4011/16
hitura-nobad · 11/16

Weather is 95% favorable for launch.

↗ 链接
07:4811/13
Cosmic_Penguin · 11/12

Tweaked launch window.

↗ 链接
20:5811/12
Cosmic_Penguin · 11/12

Added launch window per marine navigation warnings.

↗ 链接
15:4211/09
Cosmic_Penguin · 11/09

Added launch.

↗ 链接