CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

07:5603/05 CST▶ 直播
任务档案 · MISSION

星链 6-41

SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
任务成功
▶ 观看直播

任务简介

一批23颗卫星用于Starlink巨型星座——SpaceX的太空互联网通信系统项目。

原文
SpaceX

A batch of 23 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.

飞行时间线 Flight Timeline23 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:12
最大动压点Max-Q
Maximum dynamic pressure
T+02:25
主发动机关机MECO
Cut-off of the main engine
T+02:28
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:35
二级发动机第一次启动SES-1
First start of the second engine
T+03:03
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:07
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:30
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:52
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:15
一级着陆Stage 1 Landing
Landing of the first stage
T+08:39
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+53:28
二级发动机第二次启动SES-2
Second start of the second engine
T+53:29
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+01:04:37
卫星组释放Starlink
Deployment of the Starlink stack from the rocket

任务更新11

09:0303/05
Cosmic_Penguin · 03/05

Launch success.

↗ 链接
07:5603/05
Cosmic_Penguin · 03/04

Liftoff.

↗ 链接
06:5503/05
LL2 · 03/04

Livestream has started

↗ 链接
05:5803/05
Cosmic_Penguin · 03/04

GO for launch.

↗ 链接
16:0703/04
Cosmic_Penguin · 03/04

Updated launch window.

↗ 链接
14:2903/04
Cosmic_Penguin · 03/04

Updated launch weather.

↗ 链接
08:3603/02
Cosmic_Penguin · 03/02

1 day slip per marine navigation warnings.

↗ 链接
11:5102/28
Cosmic_Penguin · 02/28

Delayed to March 4 UTC.

↗ 链接
09:2702/28
Cosmic_Penguin · 02/28

Added launch window for March 3rd.

↗ 链接
17:2102/27
Cosmic_Penguin · 02/27

Targeting NET March 3 per NOTAM A0045/24 / A0719/24 / F0788/24.

↗ 链接
11:0601/11
Cosmic_Penguin · 01/11

Added launch.

↗ 链接