CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

21:0008/15 CST▶ 直播
任务档案 · MISSION

WorldView Legion 3 & 4

SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
任务成功
▶ 观看直播

任务简介

WorldView Legion 是由 Maxar 公司建造并运营的地球观测卫星星座。该星座计划由 6 颗卫星组成,分布在极轨道和中倾角轨道上,提供 30 厘米级分辨率。

原文
SpaceX

WorldView Legion is a constellation of Earth observation satellites built and operated by Maxar. Constellation is planned to consist of 6 satellites in both polar and mid-inclination orbits, providing 30 cm-class resolution.

飞行时间线 Flight Timeline25 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:09
最大动压点Max-Q
Maximum dynamic pressure
T+02:15
主发动机关机MECO
Cut-off of the main engine
T+02:18
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:22
一级翻转机动Stage 1 Flip
Flip maneuver of the first stage
T+02:26
二级发动机第一次启动SES-1
First start of the second engine
T+02:31
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+03:07
整流罩分离Fairing Separation
Separation of the payload fairing
T+03:27
助推器返回关机Booster Boostback Burn Shutdown
End of the booster boostback burn
T+06:05
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:24
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:18
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+07:48
一级着陆Stage 1 Landing
Landing of the first stage
T+08:09
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+47:21
载荷分离Payload Separation
Final deployment of the payload from the rocket
T+01:49:38
载荷分离Payload Separation
Final deployment of the payload from the rocket

任务更新18

00:5308/16
Cosmic_Penguin · 08/15

Launch success with signals acquired from satellites.

↗ 链接
22:5008/15
hitura-nobad · 08/15

All payloads deployed.

↗ 链接
21:0008/15
hitura-nobad · 08/15

Liftoff

↗ 链接
20:4108/15
LL2 · 08/15

Unofficial Re-stream by SPACE AFFAIRS has started

↗ 链接
03:5208/15
hitura-nobad · 08/14

GO for launch.

↗ 链接
02:0908/15
hitura-nobad · 08/14

Weather 80% GO

↗ 链接
21:3808/14
Cosmic_Penguin · 08/14

Refined launch window.

↗ 链接
09:0808/11
Cosmic_Penguin · 08/11

Delayed to August 15.

↗ 链接
22:1708/09
Cosmic_Penguin · 08/09

Updated launch window.

↗ 链接
08:5108/09
Cosmic_Penguin · 08/09

Adding approximate launch time via NOTAMs.

↗ 链接
06:5508/05
Cosmic_Penguin · 08/04

NET August 14.

↗ 链接
08:2907/11
Cosmic_Penguin · 07/11

NET August.

↗ 链接
12:1907/09
Cosmic_Penguin · 07/09

No longer listed for July 15.

↗ 链接
07:4805/31
Cosmic_Penguin · 05/30

NET July 15.

↗ 链接
08:4103/02
Cosmic_Penguin · 03/02

NET 2H 2024.

↗ 链接
16:1811/25
Cosmic_Penguin · 11/25

NET early 2024.

↗ 链接
11:5602/17
Cosmic_Penguin · 02/17

NET April

↗ 链接
04:3202/03
Nosu · 02/02

Setting pad

↗ 链接