CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

13:0012/29 CST▶ 直播
任务档案 · MISSION

Astranis: From One to Many (4x Astranis MicroGEO)

SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
任务成功
▶ 观看直播

任务简介

四颗Astranis MicroGEO通信卫星将被送入定制的地球静止轨道,从那里进行在轨机动以到达各自的槽位。

原文
SpaceX

Four Astranis MicroGEO communications satellite to be inserted in a custom geostationary orbit, from where they conduct on-orbit maneuvers to reach their individual slots.

飞行时间线 Flight Timeline26 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:14
最大动压点Max-Q
Maximum dynamic pressure
T+02:28
主发动机关机MECO
Cut-off of the main engine
T+02:31
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:39
二级发动机第一次启动SES-1
First start of the second engine
T+03:21
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:23
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:50
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:52
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+08:19
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:26
一级着陆Stage 1 Landing
Landing of the first stage
T+26:25
二级发动机第二次启动SES-2
Second start of the second engine
T+27:30
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+33:45
载荷分离Payload Separation
Final deployment of the payload from the rocket
T+34:45
载荷分离Payload Separation
Final deployment of the payload from the rocket
T+35:45
载荷分离Payload Separation
Final deployment of the payload from the rocket
T+36:45
载荷分离Payload Separation
Final deployment of the payload from the rocket

任务更新24

16:1712/29
Cosmic_Penguin · 12/29

All 4 satellites now in contact.

↗ 链接
13:3712/29
hitura-nobad · 12/29

All 4 Payloads deployed

↗ 链接
13:0012/29
hitura-nobad · 12/29

Liftoff!

↗ 链接
20:0912/28
Nosu · 12/28

Weather 85% GO

↗ 链接
06:0912/28
Nosu · 12/27

Setting GO

↗ 链接
00:0112/24
Cosmic_Penguin · 12/23

NET December 29.

↗ 链接
11:0912/22
Cosmic_Penguin · 12/22

Delayed for additional launch vehicle checks; new date TBD.

↗ 链接
14:0812/21
Cosmic_Penguin · 12/21

Updated launch weather.

↗ 链接
14:0512/21
Cosmic_Penguin · 12/21

Confirmed rescheduled for December 22.

↗ 链接
13:0412/21
SwGustav · 12/21

Scrubbed, more info TBD

↗ 链接
12:5412/21
hitura-nobad · 12/21

Webcast live.

11:0712/21
Cosmic_Penguin · 12/21

New T-0.

↗ 链接
08:5412/21
Cosmic_Penguin · 12/21

New T-0.

↗ 链接
09:1512/20
Cosmic_Penguin · 12/20

GO for launch.

↗ 链接
22:0412/19
Nosu · 12/19

Weather >95% GO, no concerns

↗ 链接
10:3212/17
Cosmic_Penguin · 12/17

NET December 21 UTC.

↗ 链接
23:2112/16
Cosmic_Penguin · 12/16

NET December 20 UTC.

↗ 链接
02:0012/12
Cosmic_Penguin · 12/11

NET December 18 UTC (launch window per https://www.cadenaois.org/vpublic_anspdetail.jsp?view=15#).

↗ 链接
11:3812/10
Cosmic_Penguin · 12/10

Targeting NET December 17 UTC.

↗ 链接
23:3410/10
Cosmic_Penguin · 10/10

NET November.

↗ 链接
08:1906/14
Cosmic_Penguin · 06/14

NET Q3 2024.

↗ 链接
07:2902/22
Cosmic_Penguin · 02/21

NET mid-2024.

↗ 链接
15:1311/16
Cosmic_Penguin · 11/16

NET Q1 2024.

↗ 链接
04:1304/06
Nosu · 04/05

Adding launch TBD 2023

↗ 链接