✓
任务成功
载荷已部署入轨。
06:0503/05 CST▶ 直播
任务档案 · MISSION
运输者 10 (Dedicated SSO 拼车任务)
SpaceX · 猎鹰 9 Block 5 · 4E 号发射工位 (SLC-4E)

成功
▶ 观看直播任务成功
任务简介
Transporter 10 任务是一次专用的拼车飞行,目标为太阳同步轨道,搭载数十颗小型微卫星和纳米卫星,服务于商业和政府客户。 本次飞行将携带 53 个有效载荷,包括立方星、微卫星和一个托管有效载荷。
原文
Transporter 10 mission is a dedicated rideshare flight to a sun-synchronous orbit with dozens of small microsatellites and nanosatellites for commercial and government customers. There will be 53 payloads on this flight, including CubeSats, MicroSats, and a hosted payload.
飞行时间线 Flight Timeline29 节点
T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:10
最大动压点Max-Q
Maximum dynamic pressure
T+02:20
主发动机关机MECO
Cut-off of the main engine
T+02:23
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:31
二级发动机第一次启动SES-1
First start of the second engine
T+02:36
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+03:02
整流罩分离Fairing Separation
Separation of the payload fairing
T+03:31
助推器返回关机Booster Boostback Burn Shutdown
End of the booster boostback burn
T+06:08
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:20
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:14
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+07:32
一级着陆Stage 1 Landing
Landing of the first stage
T+08:17
二级发动机关机SECO
Cut-off of the second engine
T+50:12
二级发动机第二次启动SES-2
Second start of the second engine
T+50:16
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+53:44
载荷部署序列开始Payload Deployment Sequence Start
Start of the payload deployment sequence
T+01:44:26
二级发动机第三次启动SES-3
Third start of the second engine
T+01:44:27
二级发动机第三次关机SECO-3
Third cut-off of the second engine
T+02:25:51
二级发动机第四次燃烧SEB-4
4th burn of the second engine
T+02:33:01
载荷部署序列结束Payload Deployment Sequence End
End of the payload deployment sequence.
任务更新13 条
08:4103/05
Launch success, all payloads have been deployed.
↗ 链接06:0603/05
Liftoff
↗ 链接06:0003/05
Updating weather
↗ 链接05:5603/05
Livestream has started
↗ 链接14:1603/04
GO for launch.
↗ 链接08:3903/04
Updated T-0.
↗ 链接22:2803/03
Tweaked T-0.
↗ 链接11:4602/29
Added launch window per marine navigation warnings.
↗ 链接10:0402/17
NET March 4.
↗ 链接18:0002/03
Targeting March 1
↗ 链接19:4711/08
Delayed to March 2024
↗ 链接16:3106/07
Delayed to February 2024
↗ 链接17:5503/25
Adding launch NET January 2024
↗ 链接