CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

00:0711/22 CST▶ 直播
任务档案 · MISSION

星链 6-66

SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
任务成功
▶ 观看直播

任务简介

为星链巨型星座发射一批24颗卫星——SpaceX的太空互联网通信系统项目。

原文
SpaceX

A batch of 24 satellites for the Starlink mega-constellation - SpaceX's project for space-based Internet communication system.

飞行时间线 Flight Timeline23 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:10
最大动压点Max-Q
Maximum dynamic pressure
T+02:25
主发动机关机MECO
Cut-off of the main engine
T+02:29
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:36
二级发动机第一次启动SES-1
First start of the second engine
T+02:58
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:03
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:27
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:52
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:14
一级着陆Stage 1 Landing
Landing of the first stage
T+08:39
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+54:02
二级发动机第二次启动SES-2
Second start of the second engine
T+54:04
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+01:05:11
卫星组释放Starlink
Deployment of the Starlink stack from the rocket

任务更新8

01:1611/22
Cosmic_Penguin · 11/21

Launch success.

↗ 链接
00:0811/22
Cosmic_Penguin · 11/21

Liftoff.

↗ 链接
23:5711/21
LL2 · 11/21

Unofficial Webcast by SPACE AFFAIRS has started

↗ 链接
06:3711/21
Nosu · 11/20

Setting GO

↗ 链接
23:3911/20
Cosmic_Penguin · 11/20

Updated launch weather.

↗ 链接
16:5611/20
Cosmic_Penguin · 11/20

Tweaked T-0.

↗ 链接
07:5211/13
Cosmic_Penguin · 11/12

Delayed to NET November 21.

↗ 链接
07:2911/10
Cosmic_Penguin · 11/09

Targeting NET 16 November per NOTAMs F4242/24 & A3584/24.

↗ 链接