CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

05:2506/24 CST▶ 直播
任务档案 · MISSION

运输者 14 (Dedicated SSO 拼车任务)

SpaceX · 猎鹰 9 Block 5 · 4E 号发射工位 (SLC-4E)

成功
任务成功
▶ 观看直播

任务简介

为商业和政府客户提供的专用拼车飞行,将数十颗小型微卫星和纳米卫星送入太阳同步轨道。

原文
SpaceX

Dedicated rideshare flight to a sun-synchronous orbit with dozens of small microsatellites and nanosatellites for commercial and government customers.

飞行时间线 Flight Timeline33 节点

T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:12
最大动压点Max-Q
Maximum dynamic pressure
T+02:29
主发动机关机MECO
Cut-off of the main engine
T+02:32
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:40
二级发动机第一次启动SES-1
First start of the second engine
T+03:12
整流罩分离Fairing Separation
Separation of the payload fairing
T+06:14
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+06:39
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+08:00
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+08:24
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+08:29
一级着陆Stage 1 Landing
Landing of the first stage
T+51:03
二级发动机第二次启动SES-2
Second start of the second engine
T+51:07
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+54:35
载荷部署序列开始Payload Deployment Sequence Start
Start of the payload deployment sequence
T+01:04:10
载荷部署序列结束Payload Deployment Sequence End
End of the payload deployment sequence.
T+01:41:40
二级发动机第三次启动SES-3
Third start of the second engine
T+01:41:41
二级发动机第三次关机SECO-3
Third cut-off of the second engine
T+02:12:37
二级发动机第四次启动SES-4
Fourth start of the second engine
T+02:12:38
二级发动机第四次关机SECO-4
Fourth cut-off of the second engine
T+02:16:04
载荷部署序列开始Payload Deployment Sequence Start
Start of the payload deployment sequence
T+02:25:58
载荷部署序列结束Payload Deployment Sequence End
End of the payload deployment sequence.
T+02:40:13
二级发动机第五次启动SES-5
Fifth start of the second engine
T+02:40:18
二级发动机第五次关机SECO-5
Fifth cut-off of the second engine
T+02:43:50
载荷分离Payload Separation
Final deployment of the payload from the rocket

任务更新9

08:1206/24
Cosmic_Penguin · 06/24

All payload deployment completed.

↗ 链接
05:2506/24
Cosmic_Penguin · 06/23

Liftoff.

↗ 链接
05:0506/24
Cosmic_Penguin · 06/23

New T-0.

↗ 链接
02:1806/23
hitura-nobad · 06/22

Now targeting Jun 23 at 21:18 UTC

↗ 链接
10:4806/21
Cosmic_Penguin · 06/21

GO for launch.

↗ 链接
23:3006/20
Cosmic_Penguin · 06/20

NET June 21 per NOTAMs.

↗ 链接
00:5306/13
Cosmic_Penguin · 06/12

NET June 20.

↗ 链接
13:3205/10
Cosmic_Penguin · 05/10

NET June 21.

↗ 链接
16:0904/01
Cosmic_Penguin · 04/01

Changed launch site.

↗ 链接