CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

14:3106/25 CST▶ 直播
任务档案 · MISSION

Axiom Space Mission 4

SpaceX · 猎鹰 9 Block 5 · 39A 号发射工位 (LC-39A)

成功
任务成功
▶ 观看直播

任务简介

这是一次为私营公司Axiom Space执行的载人龙飞船飞行任务。该任务将搭载一名经过专业培训的指令长和三名私人宇航员往返国际空间站。该机组人员将在空间站停留至少八天。

原文
SpaceX

This is a Crew Dragon flight for a private company Axiom Space. The mission will carry a professionally trained commander alongside three private astronauts to and from the International Space Station. This crew will stay aboard space station for at least eight days.

飞行时间线 Flight Timeline26 节点

T−45:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−42:00
机组登舱臂收回Crew Access Arm Retract
Retraction of the crew access arm from the rocket
T−39:00
发射逃逸系统 (LES) 武装Dragon
Dragon's launch escape system is armed
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−05:00
切换内部电源Dragon
Dragon transitions to internal power
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+00:57
最大动压点Max-Q
Maximum dynamic pressure
T+02:25
主发动机关机MECO
Cut-off of the main engine
T+02:28
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:36
二级发动机第一次启动SES-1
First start of the second engine
T+02:42
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+03:28
助推器返回关机Booster Boostback Burn Shutdown
End of the booster boostback burn
T+06:18
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:30
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:22
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+07:39
一级着陆Stage 1 Landing
Landing of the first stage
T+08:48
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+09:38
飞船与二级分离Dragon
Dragon separates from the second stage
T+10:26
头锥开启Dragon
Start of the opening sequence of Dragon's nosecone

任务更新35

14:5106/25
Cosmic_Penguin · 06/25

Launch success, spacecraft in orbit and functioning.

↗ 链接
14:3206/25
hitura-nobad · 06/25

Liftoff!

↗ 链接
07:3206/25
Cosmic_Penguin · 06/24

Tweaked T-0.

↗ 链接
08:4606/24
Cosmic_Penguin · 06/24

Confirmed go for launch on June 25.

↗ 链接
07:2106/24
Cosmic_Penguin · 06/23

Tweaked T-0.

↗ 链接
05:0706/24
Cosmic_Penguin · 06/23

NET June 25.

↗ 链接
07:0806/20
Cosmic_Penguin · 06/19

Further delays pending additional investigation into ISS Russian Segment air leakage.

↗ 链接
11:1906/18
Cosmic_Penguin · 06/18

Delayed to June 22.

↗ 链接
09:2806/15
Cosmic_Penguin · 06/15

Tweaked T-0.

↗ 链接
19:5806/14
Cosmic_Penguin · 06/14

Tweaked T-0.

↗ 链接
15:0206/14
Cosmic_Penguin · 06/14

NET June 19.

↗ 链接
22:4806/12
Cosmic_Penguin · 06/12

Launch delayed for further investigation into ISS Russian Segment air leakage issue; new date TBD.

↗ 链接
02:4006/12
Cosmic_Penguin · 06/11

Tweaked T-0.

↗ 链接
00:1006/12
Cosmic_Penguin · 06/11

NET June 13, TBC.

↗ 链接
19:5806/11
Cosmic_Penguin · 06/11

NET June 12, TBC.

↗ 链接
09:2606/11
SwGustav · 06/11

Launch is TBD to repair the LOX leak on the first stage

↗ 链接
21:2506/10
Cosmic_Penguin · 06/10

Tweaked T-0.

↗ 链接
21:1806/10
Cosmic_Penguin · 06/10

Updated launch weather, 85% GO.

↗ 链接
22:5906/09
Cosmic_Penguin · 06/09

Delayed to June 11 due to ascent corridor abort recovery weather.

↗ 链接
20:2906/09
Cosmic_Penguin · 06/09

Updated launch weather, 95% GO.

↗ 链接
22:0406/08
hitura-nobad · 06/08

Weather is 90% favorable for launch.

↗ 链接
11:5206/08
Cosmic_Penguin · 06/08

Tweaked T-0.

↗ 链接
23:2806/03
Cosmic_Penguin · 06/03

Delayed to June 10.

↗ 链接
22:5405/31
hitura-nobad · 05/31

Launch delayed by 1 day to the 9th of June.

↗ 链接
02:5805/15
Cosmic_Penguin · 05/14

Tweaked launch time.

↗ 链接
22:5705/10
Cosmic_Penguin · 05/10

NET June 8.

↗ 链接
10:1805/10
Cosmic_Penguin · 05/10

NET June.

↗ 链接
22:0904/29
Cosmic_Penguin · 04/29

Updated launch time.

↗ 链接
02:5704/10
Nosu · 04/09

Setting pad

↗ 链接
02:5204/10
Nosu · 04/09

Adding approximate T-0

↗ 链接
11:4202/12
Cosmic_Penguin · 02/12

NET May & switch in crew vehicle.

↗ 链接
10:1209/18
Cosmic_Penguin · 09/18

NET late April 2025.

↗ 链接
21:3308/10
Cosmic_Penguin · 08/10

NET Spring 2025.

↗ 链接
10:0712/06
Cosmic_Penguin · 12/06

NET October 2024.

↗ 链接
04:1408/04
Nosu · 08/03

NET August 2024

↗ 链接