✓
任务成功
载荷已部署入轨。
03:0901/15 CST▶ 直播
任务档案 · MISSION
运输者 12 (Dedicated SSO 拼车任务)
SpaceX · 猎鹰 9 Block 5 · 4E 号发射工位 (SLC-4E)

成功
▶ 观看直播任务成功
任务简介
为商业和政府客户提供数十颗小型微卫星和纳米卫星的专用拼车飞行,目标为太阳同步轨道。
原文
Dedicated rideshare flight to a sun-synchronous orbit with dozens of small microsatellites and nanosatellites for commercial and government customers.
飞行时间线 Flight Timeline27 节点
T−38:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−35:00
一级推进剂加注开始Stage 1 Propellant Load
Start of propellant loading in the first stage
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+01:04
最大动压点Max-Q
Maximum dynamic pressure
T+02:13
主发动机关机MECO
Cut-off of the main engine
T+02:17
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:21
一级翻转机动Stage 1 Flip
Flip maneuver of the first stage
T+02:25
二级发动机第一次启动SES-1
First start of the second engine
T+02:30
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+03:03
整流罩分离Fairing Separation
Separation of the payload fairing
T+03:25
助推器返回关机Booster Boostback Burn Shutdown
End of the booster boostback burn
T+06:12
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:41
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:15
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+07:32
一级着陆Stage 1 Landing
Landing of the first stage
T+08:15
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+50:52
二级发动机第二次启动SES-2
Second start of the second engine
T+50:56
二级发动机第二次关机SECO-2
Second cut-off of the second engine
T+54:12
载荷部署序列开始Payload Deployment Sequence Start
Start of the payload deployment sequence
T+02:22:02
载荷部署序列结束Payload Deployment Sequence End
End of the payload deployment sequence.
载荷1
Koonibba Test Range
任务更新12 条
05:3201/15
All payloads deployed.
↗ 链接03:4101/15
Unofficial Re-stream by SPACE AFFAIRS has started
↗ 链接03:0901/15
Liftoff
↗ 链接02:1801/15
T-0 is accurate to the second.
↗ 链接01:1701/15
Now targeting Jan 14 at 19:09 UTC
↗ 链接10:2701/14
GO for launch.
↗ 链接23:0601/13
Launch time is accurate to the second.
↗ 链接22:3501/07
Added launch window.
↗ 链接10:5301/07
NET January 14.
↗ 链接07:4711/13
NET January 2025. (see also Varda W-Series 2 update at https://forum.nasaspaceflight.com/index.php?topic=58044.msg2640800#msg2640800)
↗ 链接10:3508/23
NET November.
↗ 链接23:4207/08
Change in launch site.
↗ 链接