CHX·Live
⌘K
UTC—/— —:—:

任务成功

载荷已部署入轨。

01:1709/29 CST▶ 直播
任务档案 · MISSION

Crew-9

SpaceX · 猎鹰 9 Block 5 · 40 号发射工位 (SLC-40)

成功
任务成功
▶ 观看直播

任务简介

SpaceX Crew-9 是作为 NASA 商业载人计划的一部分,前往国际空间站的第九次载人操作飞行任务。

原文
SpaceX

SpaceX Crew-9 is the ninth crewed operational flight of a Crew Dragon spacecraft to the International Space Station as part of NASA's Commercial Crew Program.

飞行时间线 Flight Timeline26 节点

T−45:00
加注决议通过GO for Prop Load
Launch director verifies go for propellant load
T−42:00
机组登舱臂收回Crew Access Arm Retract
Retraction of the crew access arm from the rocket
T−39:00
发射逃逸系统 (LES) 武装Dragon
Dragon's launch escape system is armed
T−35:00
一级 LOX (液氧) 加注Stage 1 LOX Load
Start of liquid oxygen loading in the first stage
T−35:00
推进剂加注开始Prop Load
Start of propelland loading
T−16:00
二级 LOX (液氧) 加注Stage 2 LOX Load
Start of liquid oxygen loading in the second stage
T−07:00
发动机预冷Engine Chill
Start of engine chilling
T−05:00
切换内部电源Dragon
Dragon transitions to internal power
T−01:00
自动倒数启动Startup
The onboard computer takes control over the countdown and runs last checks
T−01:00
燃料箱增压Tank Press
Fuel tanks are pressurized to flight levels
T−00:45
发射决议通过GO for Launch
Launch director verifies go for launch
T−00:03
点火Ignition
Start of the engine ignition sequence
T+00:00
升空Liftoff
First upwards movement of the rocket
T+00:58
最大动压点Max-Q
Maximum dynamic pressure
T+02:27
主发动机关机MECO
Cut-off of the main engine
T+02:30
二级分离Stage 2 Separation
Separation of the second stage from the first
T+02:37
二级发动机第一次启动SES-1
First start of the second engine
T+02:43
助推器返回点火Booster Boostback Burn Startup
Start of the booster boostback burn
T+03:30
助推器返回关机Booster Boostback Burn Shutdown
End of the booster boostback burn
T+06:17
再入减速点火Entry Burn Startup
Start of the atmospheric entry burn
T+06:29
再入减速关机Entry Burn Shutdown
End of the atmospheric entry burn
T+07:22
一级着陆减速点火Stage 1 Landing Burn
Start of the first stage landing burn
T+07:39
一级着陆Stage 1 Landing
Landing of the first stage
T+08:50
二级发动机第一次关机SECO-1
First cut-off of the second engine
T+12:01
飞船与二级分离Dragon
Dragon separates from the second stage
T+12:50
头锥开启Dragon
Start of the opening sequence of Dragon's nosecone

任务更新17

01:3909/29
Cosmic_Penguin · 09/28

Launch success.

↗ 链接
01:1709/29
Cosmic_Penguin · 09/28

Liftoff.

↗ 链接
00:3709/29
Cosmic_Penguin · 09/28

Updating launch weather.

↗ 链接
21:1109/28
LL2 · 09/28

Official Webcast by NASA has started

↗ 链接
20:4909/28
Cosmic_Penguin · 09/28

Tweaked T-0.

↗ 链接
23:5109/26
Nosu · 09/26

Weather is 55% favorable for launch.

↗ 链接
17:1009/25
Cosmic_Penguin · 09/25

Tweaked T-0.

↗ 链接
07:0309/25
Cosmic_Penguin · 09/24

Delayed to NET September 28 due to weather.

↗ 链接
22:4309/23
Cosmic_Penguin · 09/23

Tweaked T-0.

↗ 链接
06:5509/19
Cosmic_Penguin · 09/18

NET September 26.

↗ 链接
01:5609/18
Cosmic_Penguin · 09/17

Tweaked T-0.

↗ 链接
03:4709/13
hitura-nobad · 09/12

Delayed by 1 day to NET 25th September.

↗ 链接
04:2408/25
Cosmic_Penguin · 08/24

Tweaked launch time.

↗ 链接
06:5108/14
Cosmic_Penguin · 08/13

Added approximate launch time.

↗ 链接
04:1908/07
hitura-nobad · 08/06

NET September 24th from SLC-40

↗ 链接
10:4107/27
Cosmic_Penguin · 07/27

NET August 18 (launch time via https://www.launchphotography.com/Launch_Viewing_Guide.html)

↗ 链接
23:2210/12
Cosmic_Penguin · 10/12

NET mid-August 2024.

↗ 链接